Software Installation and Verification
Installation Verification
Step 6. The link can now be enabled and brought up using the zterm utility:
% zterm
11:34:46 ZCOM Interactive command utility 11:34:46 Primary ZLU is 1001
ZTERM> rc 600 601 ZTERM> cn 600 601 en ZTERM> cn 600 601 ac ZTERM> ex
%
Step 7. The zmntr utility can be used to observe the state of the link:
% zmntr |
|
|
|
|
|
|
|
ZMNTR> tt 600 | 601 |
|
|
|
|
| |
ZLU# Mx p:sc | Terminal Description... | Rx.Mes Tx.Mes Errors E.Rate State | |||||
0600 00 | 0:01 | 0 | 0 | 0 | 0.00% | Up | |
0601 00 | 1:01 | 0 | 0 | 0 | 0.00% | Up | |
**** ** ** Message totals | 0 | 0 | 0 | NaN % ******** | |||
ZMNTR> ex |
|
|
|
|
|
|
Step 8. With the zterm utility set as a receiver, test messages are sent from the ZLUs:
% zterm
11:46:56 ZCOM Interactive command utility 11:46:56 Primary ZLU is 1001
ZTERM> rc 600 601 ZTERM> tx 600 50 0 2 2 11:47:14 TX test complete!!!
ZTERM>
NOTE | For this example two |
| DTE. |
|
|
22 | Chapter 2 |