York E2FB120, E3FB090 installation manual Unit Dimensions and Clearances 7-1/2 & 10 TON

Page 6

￿￿￿￿￿￿￿￿￿￿

 

￿￿￿G

Overhead (Top)1

 

Front

 

(Piping and Access Panels)

 

Left Side

 

Right Side

7￿￿￿G

Rear

 

Bottom 2

 

1Units must be installed outdoors. Overhanging structures or shrubs should not obstruct air discharge outlet.

2Adequate snow clearance must be provided if winter operation is expected.

All dimensions are in inches. They are subject to change without notice. Certified dimensions will be provided upon request.

FIG. 4 - UNIT DIMENSIONS AND CLEARANCES - 7-1/2 & 10 TON

6

Unitary Products Group

Image 6
Contents SPLIT-SYSTEM Heat Pumps Outdoor Units Installation Manual General ReferenceInspection Table of Contents Location InstallationLimitations Rigging and HandlingPower and Control Wiring Compressors Compressor Crankcase HeaterClearances Wire Sizing Refrigerant PipingGeneral Guidelines Unit Dimensions and Clearances 7-1/2 & 10 TON Field Piping Diagrams Line SizingInstallation Service ValvesExtending the Service Ports Evacuating and Charging Balance Point Setting Extending the Service PortsRefrigerant Flow Diagram Curve EFB090 Charging Curve EFB120Operation Cooling OperationHeating Operation Operation below 0F Outdoor Temperature START-UP MaintenanceSafety Features Crankcase Heater PRE-START Check