York E2FB120 Compressors Compressor Crankcase Heater, Power and Control Wiring, Clearances

Page 4

COMPRESSORS

CAUTION: Do Not loosen compressor mounting bolts.

COMPRESSOR CRANKCASE HEATER

5FT.MIN.

CAUTION: Do not attempt to start the compressor without at least eight hours of crankcase heat or compressor damage will occur.

If a unit has just been installed or the unit disconnect switch has been open for a long period of time, move the system switch on the room thermostat to the “OFF” position before closing the unit disconnect switch. Eight hours of crankcase heat are re- quired to drive the liquid refrigerant out of the compressor bef- ore the compressor can be started.

POWER AND CONTROL WIRING

FIG. 2 - TYPICAL RIGGING

CLEARANCES

WARNING: Do not permit overhanging structures or shrubs to obstruct air discharge.

TABLE 2 - PHYSICAL DATA

Compressor1

Rating, (Tons)

 

Quantity

Fans

Diameter, (In.)/No. Blades

 

Nominal CFM

Fan Motors2

HP

RPM

 

 

Face Area, (Sq. Ft.)

 

Rows Deep x Rows High

Coil

Finned Length, (In.)

 

Tube (Copper) OD - inches

 

Fins (Aluminum) per inch

Refrigerant-22

Holding Charge

Operating Charge 3

(Lbs.)

 

Pumpdown Capacity 4

 

Unit Weight

Shipping

(Lbs.)

Operating

1These compressors are fully hermetic.

2These PSC motors are directly connected to the outdoor fans and have inherent protection, ball bearings and a 48 frame. Rotation (when viewing the shaft end of the motor) - 090=CW, 120=CCW.

3Includes outdoor unit and matched indoor blower unit, but no piping. Refer to Table 6 for re- frigerant line charge.

4Based on a 95°F ambient.

POWER WIRING

NOTE:

The field-supplied disconnect switch must be suitable for an outdoor location. Although it should be installed near the unit, do NOT secure it to the unit cabinet.

Refer to Figure 3 for typical field wiring.

CONTROL WIRING

Refer to Figure 4 for the location of the control wire access opening through the front of the unit.

4

Unitary Products Group

Image 4
Contents General Reference SPLIT-SYSTEM Heat Pumps Outdoor Units Installation ManualInspection Table of Contents Installation LimitationsLocation Rigging and HandlingCompressors Compressor Crankcase Heater Power and Control WiringClearances Refrigerant Piping Wire SizingGeneral Guidelines Unit Dimensions and Clearances 7-1/2 & 10 TON Field Piping Diagrams Line SizingService Valves InstallationExtending the Service Ports Evacuating and Charging Balance Point Setting Extending the Service PortsRefrigerant Flow Diagram Curve EFB090 Charging Curve EFB120Cooling Operation OperationHeating Operation Operation below 0F Outdoor Temperature Maintenance Safety FeaturesSTART-UP Crankcase Heater PRE-START Check