BENDIX SD-15-4106 manual Installation, Disassembly, Cleaning & Inspection, Assembly

Page 6

IDLE

VALIDATION

SWITCH

PEDAL

POSITION

SENSOR

IVS

 

 

Vs

Closed Throttle (open) Range: 5-17%

DIODES

 

Open Throttle (full) Range: 70-81%

 

 

SUPPLY

TEST

TEST

VOLTAGE

 

 

 

 

LOAD

LOAD

 

LOCK TAB

 

 

 

470

470

 

 

 

 

 

PIN 6 OHM

OHM

V3 (LOGIC HIGH AT IDLE)

 

 

 

 

 

 

 

POTENTIOMETER

PIN 2

 

 

 

 

 

 

V2 (LOGIC LOW AT IDLE)

 

 

SET VOLTAGE

 

 

 

 

PIN 1

 

 

 

 

 

AND PC. NO.

 

IVS GROUND

 

 

 

SHOWN

 

 

 

 

 

 

 

 

 

 

 

HERE

 

 

 

 

5

 

 

 

 

 

 

VS

 

 

 

 

4

(INPUT)

6

 

 

Vs

APS GROUND

 

 

(IVS)

PIN 5

 

 

 

 

V 3

 

SUPPLY

 

 

 

 

 

 

 

 

 

 

VOLTAGE

 

 

 

 

PIN 3

 

V1

 

 

 

 

 

.01µ F

(OUTPUT)

 

 

 

LOCK TAB

PIN 4

APS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TEST LOAD

GROUND

3

 

 

1

47000 OHM

 

V1

 

 

IVS GROUND

 

 

 

(OUTPUT) SIG1

2

 

 

(IVS) V 2

FIGURE 8 - ET-2TREADLE ELECTRICAL TEST SCHEMATIC FOR THE CUMMINS CONNECTOR

INSTALLATION

1.Install the assembled ET-2treadle on the vehicle.

2.Reconnect the cable connector by plugging it into the potentiometer’s integral connector and pushing until the lock tab snaps into place.

DISASSEMBLY

The following instructions present a major disassembly of the ET-2treadle. They are included for reference only. Several replacement parts and maintenance kits that do not require full disassembly are available. The instructions provided with those items should be followed in lieu of the steps presented here. Refer to Figure 4 throughout the procedures.

1.Remove the treadle cover (1).

2.Remove the pivot pin’s snap ring (8).

3.Remove the pivot pin (9) and the two nyliner bearings

(10)from the treadle’s exterior. Also remove the two nyliner bearings (10) from the mounting base.

4.Remove the pivot spring (11).

5.Remove the screws (3) that secure the potentiometer

(2)to the treadle. Remove the potentiometer.

6.Remove the lever shaft’s snap ring (5).

7.Remove the lever shaft (4) and the washer (7). Then remove the roller assembly (15), the inner washer (5), and the nyliner bearing (6) from the treadle. Separate the treadle from the mounting base.

8.The roller assembly consists of the lever, roller, two springs (12 & 13), and a spring support (14). Remove the springs and the spring support from the lever.

CLEANING & INSPECTION

1.Use mineral spirits or an equivalent solvent to clean all metal parts. Be sure to thoroughly dry the parts.

2.Inspect the treadle and mounting base for severe corrosion, pitting, or cracks. Replace as necessary. Superficial corrosion and/or pitting is acceptable.

3.Inspect the cable assembly for loose or frayed wires, physical damage, or any contaminants on the connectors. Check end-tend electrical continuity at terminals. Replace as necessary.

ASSEMBLY

Refer to Figure 4 throughout the assembly procedure.

1.Install the four nyliner bearings (10) on the mounting base and treadle.

2.Place the treadle “ears” outside the mounting base “ears” so that the holes line up.

3.Install the pivot spring (11) into the base and treadle. The curved end of the spring fits into a small hole in the treadle, and the straight end fits into a small hole in the mounting base.

4.The pivot pin (9) should slide through the holes in the “ears” of the treadle and base assembly, then through the center of the spring. Secure the pin with its snap ring (8). Make sure the pivot spring is straight and is seated in its holes.

6

Image 6
Contents Description OperationEngine Idle Throttle Full Throttle Manufacturer Closed Open Preventive Maintenance GeneralDigital Volt Powerohm Supply Meter 9-16 VDC PIN C PIN a Vref Input Potentiometer PC. NO. on this Surface Removal Caterpillar output voltage is Pulse Width ModulatedCleaning & Inspection InstallationDisassembly Assembly