GE AVE22, AVE15 Through-the-Wall Installation, Finish the Wall Opening, Installation Instructions

Page 13

Through-the-Wall Installation

The case may be installed through-the-wall in both existing and new construction.

Read completely, then follow step-by-step.

IMPORTANT:

1

Any side louvers must project on the outdoor side of the wall.

The room side of the case must project into the room at least 1 1/2from the finished wall.

 

The case must be installed level from side-to-side and with a 1/ 4tilt from front to rear.

 

 

 

Remove the air conditioner from the case.

 

 

A

 

 

 

For specific instructions, refer to the Window

 

 

 

 

 

 

Installation Instructions.

 

 

 

Make certain a wall receptacle is available close

 

 

B

 

 

 

to the hole location or make arrangements to

 

 

 

 

 

 

install a receptacle.

 

 

 

Determine the size of wall opening by adding

 

 

C

 

 

 

1/8″ to the height and width of the case.

 

 

 

 

 

 

Measure height from the top of the case to the

 

 

 

bottom of the rail.

 

 

 

Place the case in the wall opening and secure

 

 

D

 

 

 

the bottom rail, case sides and top with 12

 

 

 

 

 

 

1″ long #10 wood screws.

 

NOTE: Drill pilot holes, if necessary, for proper

 

installation. If the frame is oversized, use shims to

 

prevent case distortion.

 

 

2

Finish the Wall Opening

Caulk all four sides on the outdoor side of the case to prevent moisture from getting through to the

interior wall. Use of flashing (drip rail) will further prevent water from dripping inside the wall and down

the outside of the building.

Safety Instructions Operating Instructions Installation Instructions

Brick veneer

Lintel angle

(if required) Caulking

Holes for

#10 1long

wood

screws

Flashing (drip rail)

Caulking

Plaster line

Trim molding (if desired)

Roomside

Grounding/anti-theft screw

Caulking (between bottom rail and flashing)

11/2min.

Troubleshooting Tips

Customer Service

13

Image 13
Contents Room Air Conditioners Preparing to Install GE & You, a Service PartnershipService Telephone Congratulations You Are Now Part of the GE FamilySafety Precautions About the controls on the air conditioner Mode ControlTemp Control Cooling DescriptionsAir Direction Vent ControlParts Included Window Installation InstructionsRead these instructions completely and carefully Preparing to install the air conditionerWindow Installation Instructions Storm Window Requirements Window RequirementsRemove the Air Conditioner from the Case Install the Case in the WindowKeep these screws to reattach the grille later Require two or more people to remove it fromMeasure and Cut the Window Filler Panels Assemble and Attach the Sill and Support BracketsInstall the Window Gasket and Replace the Air Conditioner Install the Window Filler Panels and Locking BracketInstallation Instructions Through-the-Wall InstallationInstallation. If the frame is oversized, use shims to Finish the Wall OpeningNormal Operating Sounds Before you call for service…See the Operating Instructions section GE Will Replace Air Conditioner WarrantyWhat GE Will Not Cover From the dateGE Answer Center Service Telephone Numbers

AVE18, AVE22, AVE15 specifications

The GE AVE series comprises advanced locomotives designed for efficiency, flexibility, and performance in freight and passenger transportation. The models AVE22, AVE15, and AVE18 stand out with their powerful features and innovative technologies, catering to the diverse needs of the rail industry.

The GE AVE22 is a heavy-haul locomotive known for its exceptional power and reliability. Equipped with a robust 12-cylinder engine, it delivers a substantial horsepower output, enabling it to haul impressive loads over long distances. This model incorporates advanced locomotive control systems that enhance traction and braking efficiency, ensuring smooth operations on varying terrains. The AVE22's design emphasizes fuel efficiency, utilizing cutting-edge technologies like electronic fuel injection and modular engine construction, which minimizes maintenance costs and downtime.

The AVE15 model is tailored for regional passenger services, providing a blend of speed and comfort. Its lightweight design and streamlined body not only enhance aerodynamics but also contribute to lower energy consumption. The AVE15 features modern passenger amenities, including spacious seating and advanced infotainment systems, ensuring an enjoyable travel experience. Safety is paramount in the AVE15, with advanced braking systems and collision avoidance technologies that adhere to the highest industry standards.

The GE AVE18 serves as a versatile solution for both freight and passenger transport. This model is equipped with dual-mode capabilities, allowing it to operate on both electrified and non-electrified tracks seamlessly. The AVE18 incorporates regenerative braking systems that recover energy during braking, further improving its overall efficiency. Its modular design allows for easy upgrades and modifications, ensuring the locomotive can adapt to evolving transportation needs over time.

Key characteristics across the AVE series include high reliability, ease of maintenance, and adherence to stringent environmental regulations. Their design principles encompass sustainability, aiming to reduce emissions and noise pollution while enhancing overall energy efficiency. The focus on innovation is reflected in advanced technologies such as telemetry systems that provide real-time data on locomotive performance, facilitating proactive maintenance and operational adjustments.

Overall, the GE AVE22, AVE15, and AVE18 represent the forefront of locomotive technology, combining power, efficiency, and passenger comfort to meet the dynamic demands of the rail industry. With a commitment to advancing rail transportation, these models not only deliver superior performance but also contribute to a more sustainable future for the industry.