GE AVE22, AVE15, AVE18 owner manual Preparing to install the air conditioner

Page 7

Preparing to install the air conditioner.

Read these instructions completely and carefully.

Before You Begin

Safety Instructions

NOTE TO INSTALLER: Leave these instructions with the air conditioner after installation is completed.

NOTE TO CONSUMER: Keep this Owner’s Manual and Installation Instructions for future use.

IMPORTANT NOTES:

For personal safety, this air conditioner must be properly grounded.

It is important to have the wall outlet and circuit checked by a qualified electrician if there is any doubt as to whether a proper ground exists.

Follow National Electric Codes (NEC) and/or local codes and ordinances.

CAUTION:

Do not, under any circumstances, cut or remove the third (ground) prong from the power cord.

Do not change the plug on the power cord of this air conditioner.

Aluminum house wiring may present special problems—consult a qualified electrician.

Operating Instructions

Electrical Requirements

These models require 230/208-volt a.c., protected with a time delay fuse or circuit breaker. These models should be installed on their own single branch circuit for best performance and to prevent overloading house or apartment wiring circuits, which could cause a possible fire hazard from overheating wires.

Tools You Will Need

Hex driver or wrench

Pencil

Flat-blade screwdriver

Level

Ruler or tape measure

Hammer

Scissors or knife

 

7

Installation Instructions Troubleshooting Tips

Customer Service

Image 7
Contents Room Air Conditioners Congratulations You Are Now Part of the GE Family GE & You, a Service PartnershipPreparing to Install Service TelephoneSafety Precautions Cooling Descriptions Mode ControlAbout the controls on the air conditioner Temp ControlAir Direction Vent ControlParts Included Window Installation InstructionsRead these instructions completely and carefully Preparing to install the air conditionerWindow Installation Instructions Storm Window Requirements Window RequirementsRequire two or more people to remove it from Install the Case in the WindowRemove the Air Conditioner from the Case Keep these screws to reattach the grille laterMeasure and Cut the Window Filler Panels Assemble and Attach the Sill and Support BracketsInstall the Window Gasket and Replace the Air Conditioner Install the Window Filler Panels and Locking BracketFinish the Wall Opening Through-the-Wall InstallationInstallation Instructions Installation. If the frame is oversized, use shims toNormal Operating Sounds Before you call for service…See the Operating Instructions section From the date Air Conditioner WarrantyGE Will Replace What GE Will Not CoverGE Answer Center Service Telephone Numbers

AVE18, AVE22, AVE15 specifications

The GE AVE series comprises advanced locomotives designed for efficiency, flexibility, and performance in freight and passenger transportation. The models AVE22, AVE15, and AVE18 stand out with their powerful features and innovative technologies, catering to the diverse needs of the rail industry.

The GE AVE22 is a heavy-haul locomotive known for its exceptional power and reliability. Equipped with a robust 12-cylinder engine, it delivers a substantial horsepower output, enabling it to haul impressive loads over long distances. This model incorporates advanced locomotive control systems that enhance traction and braking efficiency, ensuring smooth operations on varying terrains. The AVE22's design emphasizes fuel efficiency, utilizing cutting-edge technologies like electronic fuel injection and modular engine construction, which minimizes maintenance costs and downtime.

The AVE15 model is tailored for regional passenger services, providing a blend of speed and comfort. Its lightweight design and streamlined body not only enhance aerodynamics but also contribute to lower energy consumption. The AVE15 features modern passenger amenities, including spacious seating and advanced infotainment systems, ensuring an enjoyable travel experience. Safety is paramount in the AVE15, with advanced braking systems and collision avoidance technologies that adhere to the highest industry standards.

The GE AVE18 serves as a versatile solution for both freight and passenger transport. This model is equipped with dual-mode capabilities, allowing it to operate on both electrified and non-electrified tracks seamlessly. The AVE18 incorporates regenerative braking systems that recover energy during braking, further improving its overall efficiency. Its modular design allows for easy upgrades and modifications, ensuring the locomotive can adapt to evolving transportation needs over time.

Key characteristics across the AVE series include high reliability, ease of maintenance, and adherence to stringent environmental regulations. Their design principles encompass sustainability, aiming to reduce emissions and noise pollution while enhancing overall energy efficiency. The focus on innovation is reflected in advanced technologies such as telemetry systems that provide real-time data on locomotive performance, facilitating proactive maintenance and operational adjustments.

Overall, the GE AVE22, AVE15, and AVE18 represent the forefront of locomotive technology, combining power, efficiency, and passenger comfort to meet the dynamic demands of the rail industry. With a commitment to advancing rail transportation, these models not only deliver superior performance but also contribute to a more sustainable future for the industry.