Sanus Systems AFDV manual Add Top Shelf, Diagram Install Wire Hole Bushings

Page 4

Step 5 - Add Top Shelf

Place the Top Shelf (G) on the four 9” Pillars (A); then, using the four Top Bolts (F), secure the Top Shelf to the 9” Pillars.

Diagram 5

F

G

A

Step 6 - Install Wire Hole Bushings

Press a Wire Hole Bushing (D) into each of the holes in the back of the Lower Shelves (H).

Diagram 6

H

D

Sanus Systems 2221 Hwy 36 West, Saint Paul, MN 55113 1.18.06 (100004)

Customer Service: 800.359.5520. See complementary Sanus products at www.sanus.com

Image 4
Contents Assembly Instructions for Model Afdv Qty Top Shelf G Lower Shelf HAssemble the four 3 Pillars DiagramInsert four 3 Pillars into Lower Shelf Diagram Assemble Lower Shelves Assemble four 9 PillarsDiagram Install Wire Hole Bushings Add Top Shelf