Installation
Step-by-step installation
STEP 1 Select a site
Site requirements:
• Solid, level surface without carpeting or flooring that may obstruct ventilation
•Away from direct sunlight
•Adequate room for opening and closing the door
•Away from a heat source
•Room for maintenance and servicing
•Temperature range: between 10 °C and 43 °C
Clearance
See the pictures and table below for space requirements for installation.
B
Installation
A
C
24 English
Depth “A” | 694 |
|
|
Width “B” | 595 |
|
|
Overall Height “C” | 1853 |
|
|
(unit : mm)