Lightolier IS-A1 manual 1BHFPG, 144 12’ 12’-7 144 96 20’ 20’-7

Page 2

Lighting Systems IS-A1

1BHFPG

*OTUSVDUJPO4IFFUGPS"TTFNCMZBOE*OTUBMMBUJPOPG"MFSPO4FSJFT

48”

96”

4’

8’

4’-7”

8’-7”

144” 12’

12’-7”

144” 96” 20’

20’-7”

"JSQPSU3PBE'BMM3JWFS."t  t'BY  

We reserve the right to change details of design, materials and finish.

XXXMJHIUPMJFSDPN½1IJMJQT(SPVQt #

Image 2
Contents Track Retain These Instructions for Maintenance Reference1BHFPG Perf-Pierced-SolidPerf-Pierced-Solid144 12’ 12’-7 144 96 20’ 20’-7 1BHFPG’-7 1BHFPG Installing the SuspensionInstalling the First Fixture UIFFOEPGFBDISVOJOTUBMMUIFOPOQPXFSGFFEFOETFUInstalling the Lens Fig Installing the Remaining FixturesInstalling the End Cap 1BHFPGAleron Track 1BHFPGLocating the Track Head Installing the Power Feed1BHFPG 5SBDLIFBEDBTUJOHJTPSEFSFETFQBSBUFMZInstalling the Track Cover 1BHFPGAleron Shield 1BHFPG1BHFPG Creating Lens AssemblyInstalling Lens Assembly to Housing Repeat on opposite endRepeat -B and 3-C Installing the Cable BalancerInstalling an Intermediate Cable Balancer 4MJEFUIFCVMMFUJOUPUIFTMFFWFBOEUJHIUFO JH