Lightolier IS-A1 1BHFPG, Installing the Suspension, Installing the First Fixture, Canopy

Page 3

Lighting Systems IS-A1

1BHFPG

*OTUSVDUJPO4IFFUGPS"TTFNCMZBOE*OTUBMMBUJPOPG"MFSPO4FSJFT

Step 1. Installing the Suspension

A.*OTUBMMUIFTVTQFOTJPOBTTFNCMZUPUIFKVODUJPOCPYFT 'JH

B.5IFmSTUTVTQFOTJPOJOFBDISVOTIPVMECFGSPNUIFQPXFSGFFEFOETFUXIJDIDPOUBJOTQPXFSDPSEBOEBOFOE DBQ 'JH

C.*OTUBMMUIFJOUFSNFEJBUFTVTQFOTJPOBTTFNCMJFTUPUIFDFJMJOHTUSVDUVSFTVQQPSU

D."UUIFFOEPGFBDISVOJOTUBMMUIFOPOQPXFSGFFEFOETFU

Step 2. Installing the First Fixture

A.$POOFDUXJSJOHCFGPSFTMJEJOHUIFQPXFSGFFEFOEDBQPOUPUIFmYUVSF 'JH

B.1VTIUIFmYUVSFnVTIXJUIUIFFOEDBQ

C.5JHIUFOUIFTFUTDSFXTPOUIFFOEDBQPGUIFTUBSUFSmYUVSFXJUIBO"MMFOXSFODI

D.*OTUBMMTFDPOEDBCMFBTTFNCMZJOUPTUBSUFSmYUVSF

1/4-20 Strud

Crossbar

#8-32 Screws

Strain Relief

(By Others)

Canopy 4-1/2"Ø

 

1/4-20 Coupling

SJT Power Cord

Figure 1

Mounting Bracket

Mounting Hardware

(By Others)

CANOPY

Collar &

8-32 Set Screw

Stem

DO NOT CUT

Consult Factory for Adjustment

Figure 2

"JSQPSU3PBE'BMM3JWFS."t  t'BY  

We reserve the right to change details of design, materials and finish.

XXXMJHIUPMJFSDPN½1IJMJQT(SPVQt #

Image 3
Contents Perf-Pierced-SolidPerf-Pierced-Solid Retain These Instructions for Maintenance Reference1BHFPG Track1BHFPG ’-7144 12’ 12’-7 144 96 20’ 20’-7 UIFFOEPGFBDISVOJOTUBMMUIFOPOQPXFSGFFEFOETFU Installing the SuspensionInstalling the First Fixture 1BHFPG1BHFPG Installing the Remaining FixturesInstalling the End Cap Installing the Lens Fig1BHFPG Aleron Track5SBDLIFBEDBTUJOHJTPSEFSFETFQBSBUFMZ Installing the Power Feed1BHFPG Locating the Track Head1BHFPG Installing the Track Cover1BHFPG Aleron ShieldRepeat on opposite end Creating Lens AssemblyInstalling Lens Assembly to Housing 1BHFPG4MJEFUIFCVMMFUJOUPUIFTMFFWFBOEUJHIUFO JH Installing the Cable BalancerInstalling an Intermediate Cable Balancer Repeat -B and 3-C