Tech Craft SF50 Mouldings Preparation and Installation, Preparacion Y Instalacion DE LAS Molduras

Page 5

IHA0518

IHA0519

IHA0514

IHA0515

IFA0188

IHG0015

IHA0519

IHA0514

 

4x

 

 

 

MOULDINGS PREPARATION AND INSTALLATION.

PRÉPARATION ET INSTALLATION DES MOULURES.

PREPARACION Y INSTALACION DE LAS MOLDURAS.

IHA0518

INSTALL ALL MOULDINGS BEFORE THE DOWELS DRY.

COMPLÉTER L’INSTALLATION DES MOULURES AVANT QUE

LES CHEVILLES DE BOIS NE SECHENT.

COMPLETAR LA INSTALACION DE LAS MOLDURAS DURANTE

LOS CLAVIJAS DE MADERA ESTEN HUMEDOS.

TOP SHELF INSTALLATION.

INSTALLATION DE LA TABLETTE SUPÉRIEURE.

INSTALACION DE LA TABLA SUPERIORE.

IFA0188

4x

IHA0515

FOR RIGHT OPENING

POUR OUVERTURE A DROITE

PARA ABRIRSE A LA DERECHA

FOR RIGHT OPENING

POUR OUVERTURE A GAUCHE PARA ABRIRSE A LA IZQUIERDA

IHG0015

Image 5
Contents SF50 SF50 Preparacion DE LA Tabla Inferior TOP and Fixed Shelves and Gables PreparationBottom Shelf Preparation Instalacion DEL Panel Lateral Derecho Bottom and Fixed Shelves and Left Gable InstallationRight Gable Installation TOP Shelf Installation Mouldings Preparation and InstallationInstall ALL Mouldings Before the Dowels DRY Preparacion Y Instalacion DE LAS MoldurasInstalacion DE LAS Tablas Ajustables Back Panel InstallationInstalacion DEL Panel Trasero No PRE-DRILLED Holes are Provided for Back Panel ScrewsDoor Installation Fabric InstallationInstalacion DEL Pano Instalacion DE LA PuertaIHG0015 IHA0517 IHA0421B