Tech Craft SF50 manual IHG0015 IHA0517 IHA0421B

Page 8

IHG0015

IHG0015

IHG0015

IHG0015

IHA0517

IHA0517

IHA0421B

DOOR INSTALLATION.

INSTALLATION DE LA PORTE.

INSTALACION DE LA PUERTA.

FOR LEFT OPENING

POUR OUVERTURE A GAUCHE

PARA ABRIRSE A LA IZQUIERDA

IHG0015

IHA0517

IHA0421B

IHG0015

IHG0015

IHG0015

Image 8
Contents SF50 SF50 Preparacion DE LA Tabla Inferior TOP and Fixed Shelves and Gables PreparationBottom Shelf Preparation Instalacion DEL Panel Lateral Derecho Bottom and Fixed Shelves and Left Gable InstallationRight Gable Installation Mouldings Preparation and Installation TOP Shelf InstallationInstall ALL Mouldings Before the Dowels DRY Preparacion Y Instalacion DE LAS MoldurasBack Panel Installation Instalacion DE LAS Tablas AjustablesInstalacion DEL Panel Trasero No PRE-DRILLED Holes are Provided for Back Panel ScrewsFabric Installation Door InstallationInstalacion DEL Pano Instalacion DE LA PuertaIHG0015 IHA0517 IHA0421B