connections
INSTALLING THE Toroidal FERRITE ON THE POWER CABLE
Lift up to release the lock and open the core.
EnG ections ●conn
Close the lock back. | Wind Power cable around the core three times. |
| (Start winding at |
11
Lift up to release the lock and open the core.
Close the lock back. | Wind Power cable around the core three times. |
| (Start winding at |
11