PIPING DIAGRAM WITH UV-LIGHT
9 X
N570-0043 (8-32 X 3/4")
TO
ELECTRICAL
OUTLET
1
3
|
|
|
| 2 | |
|
|
|
| 4 | |
FROM THREE |
|
|
|
| |
WAY VALVE TO | FROM WATERFALL |
|
|
| |
WATERFALL | DRAIN TO BASIN |
|
|
| |
A | B |
|
|
| |
|
|
| A | FROM THREE WAY | |
FROM BASIN TO |
|
| VALVE TO WATERFALL | ||
|
|
| |||
WATERFALL DRAIN |
|
|
| ||
| B |
|
| FROM WATER | |
|
|
|
| ||
|
|
|
| SOURCE TO | |
INSTALL THE SUPPLIED |
|
| FLOAT VALVE | ||
|
|
| |||
HOSE CLAMPS ON EITHER |
|
|
| ||
SIDE OF THE BASIN |
|
|
| ||
|
|
|
| SADDLE VALVE | |
|
| UV |
| FLOW CONTROL | |
OVERFLOW |
| VALVE / PURGE | |||
LIGHT | WATER | VALVE | |||
PROTECTION | |||||
| FILTER |
| |||
|
|
|
| ||
TO DRAIN | PURGE LINE |
|
|
|
REMOVE COMPONENTS FROM BASIN AND ASSEMBLE AS SHOWN. THE FITTINGS REQUIRED ARE ALREADY ATTACHED TO THE FILTER AND BASIN. WHEN USING THE OPTIONAL
FILTER WILL NEED TO BE REMOVED AND THREADED INTO THE ELBOW AT THE BOTTOM OF THE |
|
NECT THE |
|
SUPPLIED GROUND WIRE IS CONNECTED FROM THE GROUNDING TERMINAL ON THE UV LIGHT TO EITHER GROUNDED |
|
COPPER PLUMBING, OR THE GROUND IN YOUR ELECTRICAL SYSTEM. USE THE SUPPLIED SHORT PIECE OF BLACK |
|
TUBING TO RUN FROM THE PUMP TO THE UV LIGHT. MEASURE AND CUT THE LINES TO THE LENGTH NECESSARY, PUSH |
|
ONTO THE BARBED FITTINGS AND SECURE WITH THE SUPPLIED HOSE CLAMPS. LEAK TEST THE WATERFALL BEFORE | 11 |
FULLY ENCLOSING. |