Jotul F 500 operating instructions Adding Fuel, Formation of Creosote

Page 14

Starting and Maintaining a Fire

Burn only solid wood directly on the bottom grate of the stove, do not elevate the fire in any way.

The ash pan door on the stove must always be securely closed when the stove is in operation.

Burning the stove with the ashpan open will over-fire the stove and cause interior damage.

With the primary air control lever in the full open position, start with several sheets of crumbled newspaper placed directly on the grate. On top of the newspaper, place several pieces of small dry kindling (approx. 1” in diameter) with two to three larger logs (approx. 3” to 5” in diameter) on top.

Light the fire and close the door, slowly building the fire by adding larger and larger logs. Be sure to follow the break-in procedure before creating a fire that will damage the stove.

Once the stove has reached a surface temperature range of between 400° and 600°, adjust the primary air control lever as necessary to generate the heat output and burn time desired.

Jøtul recommends the use of a magnetic stove top thermometer to monitor the surface temperature of the stove. The optimum surface temperature range for the most efficient burn is between 400° and 600°. See figure 12 below for the optimum locations of a stove-top thermometer.

STOVE-TOP

STOVE-TOP

THERMOMETER

THERMOMETER

FIGURE12

NEVER OVERFIRE THE STOVE. IFANYPARTOF THE STOVE OR CHIMNEY GLOWS, YOU ARE OVERFIRING, AND A HOUSE FIRE OR SERIOUS DAMAGE TO THE STOVE OR CHIMNEY COULD RESULT. IMMEDIATELY CLOSE DOWN THEAIR CONTROL IF YOU NOTICE THIS CONDITION.

Adding Fuel

When reloading the stove while it is still hot and a bed of hot embers still exist, follow this reloading procedure:

·Always wear gloves when tending to the stove.

·Push the air control lever to the full open position (far right).

·Wait a few seconds before opening the door.

·Use a stove tool or poker to distribute the hot embers equally around the firebox.

·Load the fuel, usually with smaller logs first.

·Close the door, be sure to latch the door tightly.

·Wait 5 – 10 minutes before adjusting the primary air to the desired heat output setting.

(If you have at least a 2” thick ember bed when reloading, it may be possible to close the door and immediately adjust the air control setting).

The Formation of Creosote

When wood is burned slowly and at low temperatures, it produces tar and other organic vapors, which combine with moisture to form creosote. The slow moving smoke carries the creosote vapors, which condense in the cooler chimney flues, and this creosote then sticks to the chimney walls.

The creosote that accumulates in the chimney is highly flammable and is the fuel of chimney fires. To prevent chimney fires it is important to have the chimney and chimney connector pipe inspected and/or cleaned semi-annually. A qualified chimney sweep or other authorized service person can provide this service.

It is also important to remember that chimney size, temperature and height all affect draft which in turn affects the formation of creosote. Be sure to follow the installation and operation guidelines established in this manual.

14

Image 14
Contents Jotul F Oslo Woodstove Table of Contents Canadian Standards CAN/ULC-S627-M93 StandardsOslo F500 wood stove has been tested and listed to Jøtul Oslo F500 WoodstoveDo not use the connector pipe as a chimney ReminderChimney Requirements Masonry ChimneysU.S Chimney HeightWall PASS-THROUGHS Common MethodSee .3.1 and 5.3.2 of CAN/CSA B365-M91 Connecting to the ChimneyCanada Masonry ChimneyHearth-mount into a Masonry Fireplace Prefabricated ChimneysFloor Protection Using Shields to Reduce ClearancesClearances to Combustibles Clearances to walls and ceilingsMobile Home Installations AlcoveOslo F500 Woodstove Clearances Oslo F500 Woodstove Clearances Controls on the Oslo F500 OperationDo Not Burn Breaking in your new stoveAdding Fuel Formation of CreosoteRinse and dry glass completely, before burning your stove MaintenanceGlass Care Gaskets General MaintenanceAccessories Gasket List for the Oslo F500Bottom Heatshield Floor Bracket KitRear Heatshield Exploded View of the Oslo F500 Parts List for the Oslo F500 Jøtul ASA