Hubbell Electric Heater Company ME manual Immersion Temperature High Limit CUT-OFF

Page 16

IMMERSION TEMPERATURE HIGH LIMIT CUT-OFF

1.Disconnect power from unit.

2.Remove access cover.

3.Remove high limit cover screw and cover.

Cover

Cover Screw

Reset Switch

4. Disconnect the two (2) 14 gauge wires.

Wires

Capillary Tube

5. Remove capillary tube and bulb from thermowell

6. Remove two (2) mounting screws.

Mounting Screws

7.Remove control and install new high limit switch by performing above

steps in reverse order. (Note: Be sure to place capillary tube into slot in base prior to installing cover.)

16

Image 16
Contents Electric Heater Company Hubbell Electric Heater Company STRATFORD, CTTable of Contents Section Title Page Section I General Description and Construction TankTank Connections Heating ElementControl Thermostat Temperature High Limit SwitchOuter Shell and Insulation Options Low Water Cut-OffWater Heater Placement Securing of HeaterMounting Dimensions Piping Installation Filling the HeaterElectrical Installation Final ChecksSection III Scheduled Maintenance and Operation Maintenance and OperationFreezing Quarterly InspectionAnnual Inspection Section IV Troubleshooting Symptom Probable Cause Corrective Action / RemedySection V Servicing & Replacement of Parts Surface Temperature High Limit CUT-OFFImmersion Temperature High Limit CUT-OFF Heating Element Page Page Surface Mounted Thermostat Immersion Thermostat Relief Valve Section VI Miscellaneous Charts and Formulas Element Chart Formulas Torque Values Section VII ABS Type Approval Program Page Page