ELECTRICAL INSTALLATION

1.Enter junction box with properly sized feeder leads. Single-phase installations require two (2) leads; three phase installations require three (3) leads.

2.Connect these power leads to wires enclosed in junction box with wire nuts.

3.All other electrical connections are made at the factory; therefore, no other electrical connections are necessary.

FINAL CHECKS

1.Check all connections for tightness.

2.Ensure that all the above steps are completed

3.After the water is heated for the first time, monitor the water temperature as described in Section III, Quarterly Inspection.

11

Image 11
Contents Electric Heater Company STRATFORD, CT Hubbell Electric Heater CompanyTable of Contents Section Title Page Heating Element Section I General Description and ConstructionTank Tank ConnectionsOuter Shell and Insulation Temperature High Limit SwitchControl Thermostat Low Water Cut-Off OptionsSecuring of Heater Water Heater PlacementMounting Dimensions Filling the Heater Piping InstallationFinal Checks Electrical InstallationQuarterly Inspection Section III Scheduled Maintenance and OperationMaintenance and Operation FreezingAnnual Inspection Symptom Probable Cause Corrective Action / Remedy Section IV TroubleshootingSurface Temperature High Limit CUT-OFF Section V Servicing & Replacement of PartsImmersion Temperature High Limit CUT-OFF Heating Element Page Page Surface Mounted Thermostat Immersion Thermostat Relief Valve Section VI Miscellaneous Charts and Formulas Element Chart Formulas Torque Values Section VII ABS Type Approval Program Page Page