Enerco operating instructions MH80CV MH200CV

Page 7

SIZE AND CAPACITY OF PROPANE CYLINDERS REQUIRED

The charts below show the approximate size of the cylinder required for these heaters. To use the chart:

1.Select the lowest air temperature expected (at the bottom of the chart).

2.Move straight up to time of operation desired (left side of chart).

3.Read the cylinder size required.

All heaters should have:

full cylinders

 

good air circulation

 

no frost on cylinders

MH80CV

MH200CV

Fuel Cylinder Capacity: 100#

Mr. Heater Convection Construction Heater

7

Operating Instructions and Owner’s Manual

Image 7
Contents Convection Construction Heater Specifications Table of ContentsGeneral Hazard Warning Minimum Clearance From normal combustible material Operating PrecautionsSafety Precautions Ft2Fuel GAS Odor Odor Fade WarningOdor Fading no Odor Detected Make sure clip goes into Servicing Operating InstructionsMH80CV MH200CV Description Qty Mr. Heater Convection Construction Heater Model #MH80CVBTU Mr. Heater Convection Construction Heater Model #MH200CVMr. Heater Convection Construction Heater Mr. Heater Convection Construction Heater Parts Ordering Information For Information Regarding Service