Heat Controller MGD60-E5A, MGD90-E5A, MGD90-E3A, MGD75-E5A, MGD60-E3A, MGD75-E3A Connect Power Supply

Page 9

MGD Series Gas Furnace

Installation Instructions

CONNECT POWER SUPPLY

1.Remove the furnace control panel cover.

2.Insert 115 V wiring through a strain relief bushing on the left side of the furnace.

3.Connect the HOT wire to the black pigtail lead; connect the NEUTRAL wire to the WHITE pigtail lead. Secure the connections with suitable wire nuts and wrap with electrical tape. Refer to Wiring Diagram on Pg. 11 for connections.

4.Connect the GROUND wire to a grounding screw in the control panel.

5.Reinstall and secure the control panel cover with screws.

Heat Controller, Inc. Jackson, MI 49203

MGD Installation Instructions 9

Image 9
Contents Sealed Combustion Downflow MGD Series GAS Furnace General InformationSave this Manual Product Code SpecificationsSafety Considerations Return AIR Alcove Instruction Closet InstallationsPage Page Sealed Combustion Roof Jack Required Installation in Snow Regions Installing Roof JackCutting Roof Jack Opening Roof Jack on HI-PITCH RoofConnect Power Supply GAS Pipe and TUBING-MIN Sizes Model Type Length Tubing MGD Wiring DIAGRAM, MGD Replacement Parts MGD Gas Furnace Parts List MGD Series Gas Furnace Installation Instructions