Desa (V)TC36NE SERIES, (V)TC36PE SERIES installation manual High Altitude Installation

Page 15

VENTING INSTALLATION INSTRUCTIONS

Installation for Vertical Termination (Cont.) High Altitude Installation

15

VENTING INSTALLATION INSTRUCTIONS

Continued

Vertical Venting

V = 40' max.

HIGH ALTITUDE INSTALLATION

Your DESA direct-vent fireplace has been tested and approved for elevations from 0-2000 feet (USA) and elevations from 0-4500 feet (Canada) .

When installing this fireplace at an elevation above 2000 feet (in the USA), you may need to decrease the input rating by changing the existing burner orifice to a smaller size. Reduce input 4% for each 1000 feet above sea level. Check with your local gas company for proper orifice size identification.

When installing this fireplace at an elevation above 4500 feet (in Canada), check with local authorities.

Consult your local gas company to help determine the proper orifice for your location.

For assistance with any high altitude installation contact DESAʼs Customer Service Department at 1-866-672-6040.

Note: Install restrictor into inner collar of fireplace as shown.

45° Elbow

Figure 24 - Vertical Venting Configuration With No Horizontal Run (Vertical Round High Wind Termination Shown)

116234-01C

www.desatech.com

Image 15
Contents For Your Safety What to do if YOU Smell GAS For Your SafetySafety Information Table of ContentsLocal Codes Safety Information Product IdentificationProduct Features PRE-INSTALLATION PreparationLocation and Space Requirements Specific venting clearances ClearancesFraming and Finishing VentTermination CAP AIR Supply Inlet GAS Meter Location of Termination CAPInstallation Precautions Venting Installation InstructionsCenter Installation PlanningHorizontal Termination Installation Male Female Slots Locking LugsVent Pipe Vent Cap Wood ScrewInterior Wall Surface Firestop Vent Cap HorizontalHorizontal Termination Configurations Recommended Applications Corner ground floor installation Over 12 horizontal pipeTermination is possible Venting with Two 90 Elbows Roof Flashing Wall Strap Elbow Ceiling Firestop Installation for Vertical TerminationFlat Ceiling Installation Connect a section of pipe and extend up through the holeElbow Into inner collar fireplace as shown Vertical Termination ConfigurationsHigh Altitude Installation Desa 5/8 Pipe & Vent Kits Venting InstallationFireplace Installation Check GAS Type Installing Optional Blower AccessoryDecal on the firebox bottom approximately 12 in front Fireplace InstallationModel BKT Installation By turning knob fully counterclockwise before continuingInstalling GAS Piping to Fireplace Location Blower Wiring DiagramInstallation Items Needed Connecting Fireplace to GAS Supply Pressure Testing Gas Supply Piping SystemChecking GAS Connections Bubbles forming show a leak. Correct all leaks at once Pressure Testing Fireplace Gas ConnectionsREMOVING/REPLACING Glass Door Removing Louver PanelsInstalling Lava Rock and Glowing Embers Cleaning Glass DoorRemoving Glass Door Extension Cord Ignition Installing Brick Liner Models BL36DASA and BL36DHASAWall Switch Installation Optional Remote ControlEquipment Pilot Wiring DiagramOperating Fireplace Lighting InstructionsOperation Operating Optional Blower AccessoryTo Turn OFF GAS To Appliance Optional RemoteLogs Cleaning MaintenanceGlass Door Pilot and BurnersTroubleshooting Restrictions or obstruction PositionBL36DHASA for log/grate removal Improper vent configurationParts Under Warranty Replacement PartsService Hints Technical ServiceSpecifications Models TC36NE, VTC36NE, TC36PE and VTC36PE Illustrated Parts BreakdownKEY Part Number TC36NE/PE VTC36NE/PE Description QTY Parts List19 18 116234-01C KEY Part Number Description Accessories Brand ModelDate Purchased Serial Number Industrial Drive Box Bowling Green, KY 116234-01C Warranty Information Model Serial No Date PurchasedIndustrial Drive P.O. Box