Desa Tech CGCFTN, CGCFTP installation manual For Built-In Installation, Outlet

Page 13

INSTALLATION

Installing Blower Accessory - GA3450T (Cont.)

13

INSTALLATION

Continued

9.Install the switch plate on the valve cover shield with 2 #10 screws provided (see Figure 19). Reinstall the valve cover shield. Route power cord out of the cabinet by inserting it through the bushing on the outer casing (see Figure 18, page 12). Plug fan kit into 120-Volt grounded power supply and test operation. Note: When switch is in the AUTO position, the fan will start after the heater has run for a few moments. The fan will continue to run for several moments after the heater has been turned off. When switch is in the ON position, the fan will run until turned to OFF. Reinstall upper louver assem- bly and hood if previously removed, (see Figure 16, page 11). Close lower louver door.

Valve Cover

Shield

Switch

Plate

Screw

Figure 19 - Installing Switch Plate to Valve Cover Shield

For Built-In Installation

WARNING: A licensed electrician must connect the wiring harness to electrical supply following all local codes. Electrician must provide a clamp on the box cover to secure the wiring. Wiring should be routed through the bushing in the hole on the outer casing of heater.

Follow instructions in Removing Valve Cover Shield, page 12, then

1.Install a snap bushing found in hardware kit into one of the holes found on rear of valve cover shield. The other hole is for a strain relief clamp (not supplied) to secure incoming electri- cal supply.

2.Follow steps 2 through 6 in Installing Blower Assembly, begin- ning on page 12. Also remove black wire from middle switch terminal 2.

3.Remove black plastic strain relief and power cord from switch plate. The power cord supplied will not be used in built-in in- stallations. Pop in the plastic snap bushing found in hardware kit into the hole left by supply cord/strain relief.

4.A licensed electrician must follow the wiring diagram to con- nect incoming electrical supply to fan kit wiring harness (see Figure 20).

5.Plug power cord to the outlet receptacle (not provided) as shown in Figure 21. Wind the extra cable in power cord and and tie it up with the plastic wire strap (see Figure 21). Set the cable bundle between the burner bracket and outer casing, away from the burner.

6.Reinstall valve cover shield.

7.Test to make sure the blower is working properly.

8.Reinstall upper louver assembly and hood if previously removed, (see Figure 16, page 11). Close lower louver door.

 

Fan Switch

 

 

 

 

 

 

 

(Auto/Off/On)

 

 

 

 

 

 

 

 

1 Auto

 

 

 

 

 

 

 

Off

2

 

 

 

 

 

 

 

 

 

 

 

3

Blue

 

Thermostat

 

 

 

On

 

 

 

Switch

 

 

 

 

 

 

(N.O.)

110/115

 

 

Red

 

 

 

 

Blue

V.A.C.

 

 

 

 

Blower

 

Black

 

 

 

 

 

 

 

 

Motor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Red

 

 

 

 

 

 

 

 

 

 

White

 

 

 

 

 

 

White

 

 

Green

 

 

 

 

 

 

Green

Figure 20 - Wiring Diagram For Blower Accessory Built-In Installation

Blower Bracket

Wire

Assembly

Harness

 

Screw

Switch

Power

Cord

 

Outlet

3

Receptacle

2

 

1

 

Blue Red

Switch

Plate

Plastic

Wire Strap

Valve

 

 

Cover

Box Cover

Wire

Shield

Harness

Clamp Connector

 

 

 

(not included)

 

Figure 21 - Installing Blower Bracket Assembly

For morevisit www..com

111044-01D

Image 13
Contents What to do if YOU Smell GAS OWNER’S Operation and Installation ManualSafety Information Table of ContentsProduct Identification Local CodesAssembly Product FeaturesUnpacking Providing Adequate Ventilation AIR for Combustion and VentilationAssembling Hood Unusually Tight ConstructionConfined and Unconfined Space Determining FRESH-AIR Flow for Heater LocationDetermining if You Have a Confined or Unconfined Space Ventilation AIR InstallationCheck GAS Type Ventilation Air From Inside BuildingLocating Fireplace Installation ItemsRough Opening for Installing in Wall BUILT-IN Fireplace InstallationOptional Mantel Installation Mantel Clearances for BUILT-IN InstallationRemoving Upper Louver Assembly Installing Blower Accessory GA3450TRemoving Valve Cover Shield Installing Blower AssemblyOutlet For Built-In InstallationAttaching Wood Base to Solid Floor Connecting to GAS SupplyExtension Cord Installation Items Needed Connecting Equipment Shutoff Valve to Heater ControlPressure Testing Fireplace Gas Connections Pressure Testing Gas Supply Piping SystemChecking GAS Connections Operating Fireplace For Your Safety Read Before LightingLighting Instructions Inspecting Burner Cleaning Burner Injector Holder and Pilot AIR Inlet Hole Cleaning and MaintenanceCabinet Air PassagewaysObserved Problem Possible Cause Remedy TroubleshootingMaintenance, Gas leak. See Warning statement at Replacement Parts SpecificationsService Hints Technical ServiceModels Cgcftp and Cgcftn Illustrated Parts BreakdownParts List Parts ListParts Centrals Owners Registration Form Postage Required Accessories Warranty Information

CGCFTP, CGCFTN specifications

Desa Tech, an innovator in the field of electronic components, has introduced the CGCFTN and CGCFTP series, designed to meet the varying needs of modern technology applications. These devices are engineered with high-performance features that make them suitable for a wide range of industries, including telecommunications, automotive, and consumer electronics.

One of the standout features of the CGCFTN and CGCFTP series is their impressive frequency range. These components are capable of operating within a broad spectrum, providing users with flexibility and ensuring that they can be leveraged in various high-frequency applications. The advanced design minimizes signal loss and maximizes efficiency, making them ideal for both analog and digital signal processing.

In terms of technology, the CGCFTN and CGCFTP series utilizes cutting-edge semiconductor technology, ensuring high speed and reliability. The components are manufactured using a robust fabrication process that adheres to international quality standards, resulting in devices that not only perform well but also boast long lifespans. The advanced materials used in their construction contribute to their strength, heat resistance, and overall durability.

The CGCFTP variant is particularly notable for its enhanced power handling capabilities, which ensures that it can efficiently manage high power levels without compromising performance. This makes it a valuable asset in high-demand environments, such as telecommunications infrastructure and industrial machinery.

Another characteristic of these components is their compact design, which allows for easy integration into various devices. This small footprint does not sacrifice performance, ensuring that users can achieve their design goals without needing to make substantial compromises on space or weight. Furthermore, both series feature low power consumption, making them environmentally friendly options for modern electronic designs.

Overall, the Desa Tech CGCFTN and CGCFTP series represents a significant advancement in electronic component technology. With features such as wide frequency range, high power handling, and reliable performance, they are well-suited for a multitude of applications. These devices exemplify Desa Tech’s commitment to innovation, quality, and sustainability, making them a preferred choice for engineers and manufacturers in various sectors striving for excellence in their designs.