5 INSTALLING THE INTERIOR INSTALLATION SCREWS
A.Drill 1/8" x 1" deep pilot holes into the rough framing through the clearance holes in the top (head) and sides (jambs) of the unit frame.
B.On the sides of the door, drive #10 x
EXTERIOR |
STUCCO |
INTERIOR |
FIXED JAMB
VENT JAMB
Drill 1/8" diameter pilot 5A hole through the clearance
hole in the frame.
5B #10 x
13/16" Pilot
EXTERIOR |
STUCCO |
INTERIOR |
C. Apply sealant to each |
|
pilot hole drilled in the |
|
top (head) of the door |
|
frame, then insert a #10 x |
|
| |
screw into each hole. | Sealant |
| goes here |
5C
6 REINSTALL THE SLIDING PANEL
TWO OR MORE PEOPLE WILL BE REQUIRED TO HANDLE THE PANEL SAFELY.
A.Insert door panel. From the exterior of the building, tilt the top of the panel toward the door frame and insert the top of the door panel into the top track. Move the bottom of the panel toward the door frame until it is vertical. Gently set the panel down into the bottom track. Adjust the panel clip and tighten the panel clip screw.
Note: Be careful not to pinch your fingers between the two panels. DO NOT close the sliding panel until you have installed the hardware. The door may lock when closed.
6A6A |
B.Install the handles and panel retainer. Follow the instructions included in the hardware package. If the panel is not square to the door frame, adjust the bottom rollers by removing the adjusting hole cover and inserting an 8" long #2 Phillips screwdriver into the hole. Turn clockwise to raise the panel and
C.Install screen. Instructions for installing the screen are found in the screen door package.