Patterson-Kelley TBIG-03 owner manual Sequence of Operation

Page 18

Gemini™ Twin-Fuel Gas-Fired Boiler

In the case of the twin-fuel boiler, the phrase “main gas cock” or “main gas valve” as used in the “Installa- tion and Owner’s Manual” applies to the manual shut- offs for both the natural gas and propane supplies.

7.2SEQUENCE OF OPERATION

Status (red and green) indicators located on the front of the control panel of this boiler are specifically de- signed to indicate the sequence of operations and the cause of common problems. Careful observation of indicators should provide a guide to most operational conditions and problems.

Refer also to the wiring diagrams in Section 8.

The sequence of operation for the twin-fuel model differs slightly from the standard model:

1.When the On/Off (main power) switch is turned on, a green indicator marked "Power" or the am- ber switch is illuminated. Power is applied through a series of normally closed limit switches, including water flow, gas pressure, and high tem- perature, and through the operating temperature control to the flame-safeguard programmer.

2.The water flow limit switch is closed when there is adequate water flow through the boiler.

3.When adequate gas pressure is available, the low gas-pressure limit switch is closed. Manual reset is required following conditions resulting in low gas pressure.

4.If the temperature sensed by the high-limit tem- perature control is below the set limit, the nor- mally closed position of the switch sends power to the operating temperature control. Manual reset is required following conditions exceeding high- temperature limit. The limit series is complete unless an external control is placed ahead of the water flow limit (replacing the red jumper wire).

5.When heat is required, as indicated by outlet water temperature, power is applied to Terminal 6 of the programmer, which initiates the burner operating sequence, and to an indicator marked "Heat."

6.The programmer first energizes Terminal 4 which supplies power to the contactor for the blower mo-

-16 -

tor and the air flow switch, which initially shows low air flow with the "LowAir" indicator. This indicator will remain on until sufficient air flow is sensed.

7.A time delay of 10 seconds (standard) or 30 sec- onds (depending on insurance or local code re- quirements) occurs after the air proving switch closes and the programmer signals a continuation of the start sequence. During this time period the combustion chamber is pre-purged to eliminate any residual combustible gas or combustion prod- ucts.

8.A 10-second "trial-for-ignition" period is initiated with both Terminals 10 and 8 being energized. Terminal 10 of the programmer powers the igni- tion transformer and the "Ignite" indicator. The transformer output creates a spark at the igniter. Terminal 8 powers the pilot gas valve and the in- dicator for "Pilot."

9.When a pilot flame is detected by the flame rod, a signal is sent to Terminal F in the programmer. Terminal 10 is de-energized shutting off the spark ignition and the pilot remains on for ten seconds during the flame establishing period.

10.After the flame establishing period, Terminal 9 is energized, which opens the motorized main gas valve and the motorized gas valve to the fuel sup- ply in use and lights the "Main Gas" indicator. The boiler fires. After ten seconds, Terminal 8 is de-energized and the pilot valve and indicator light are extinguished.

An auxiliary panel prevents the motorized gas valves for natural gas and propane to be open at the same time.

Lo-Hi-Lo: When Terminal 9 is energized, the Lo- Hi-Lo valve will be maintained in the low fire po- sition for "low fire start" for ten seconds. If the operating temperature control calls for high fire, the programmer will initiate high fire (Terminal 21) at the same time the pilot valve and indicator is de-energized.

A power failure during operation closes all motor- ized gas valves and shuts down the boiler. When power is restored the controller recycles to Step 1;

Image 18
Contents Installation Table of Contents Introduction Principle of Operation Electrical Hazards Burn, Fire, and Explosion HazardsCrush Hazards Chemical HazardsNatural gas connection manual shutoff Gas Pressure Adjustment Test of Motorized Gas Valves Schematic Diagram of Bleeds and Vents Gas Bleeds and VentsTest of Ignition Safety System Lo-Hi-Lo Control Panel faceplate openedTest of Gas Pressure Switch Test of Low Water CutoffTest of High-Limit Control Gas Pressure Adjustment Leak Testing of ValvesInstallation Twin-Fuel Gas Train Lighting Procedures TestsStarting System Normal Shut-Down Procedures Emergency Shut-DownMaintenance Sequence of Operation Parts and Technical Support Wiring Diagram Lo-Hi-Lo Control Logic Diagram Lo-Hi-Lo Wiring Diagram On-Off Control Logic Diagram On-Off

TBIG-03 specifications

The Patterson-Kelley TBIG-03 is a cutting-edge boiler designed for commercial and industrial heating applications. Known for its robust construction and high efficiency, this model is popular among facility managers and engineers who prioritize reliability and performance.

One of the standout features of the TBIG-03 is its ability to operate at high efficiencies exceeding 90%. This efficiency translates into significant fuel savings and reduced greenhouse gas emissions, making it an environmentally friendly choice for businesses looking to minimize their carbon footprint. The boiler utilizes advanced condensing technology, allowing it to capture and recycle heat from flue gases that would otherwise be lost.

The TBIG-03 is equipped with a reliable control system that optimizes performance and enhances user control. The integrated digital display allows operators to monitor various parameters in real-time, ensuring that the system operates within optimal ranges. This not only improves the boiler's efficiency but also extends its lifespan by preventing unnecessary wear and tear.

Durability is another hallmark of the TBIG-03. Constructed with high-quality materials, including a stainless steel heat exchanger, this boiler is built to withstand the rigors of continuous operation. The heat exchanger is designed to facilitate quick heat transfer, further contributing to the unit’s efficiency and reliability.

Ease of maintenance is also a significant consideration in the design of the TBIG-03. With readily accessible components, service technicians can perform routine inspections and repair work with minimal downtime. This is a crucial factor for commercial operations, where system reliability is paramount.

Moreover, the TBIG-03 supports a variety of fuel options, including natural gas and propane, increasing its versatility across different applications. This adaptability allows facilities to choose the most cost-effective and resource-efficient fuel source available.

Overall, the Patterson-Kelley TBIG-03 stands out in the market due to its high efficiency, durability, and ease of use. Whether for heating large commercial spaces or industrial processes, this boiler meets the needs of modern enterprises seeking reliable and sustainable heating solutions. Its advanced features and technologies make it a top choice for efficiency-driven facility management.