Flag |
| |
angle |
| |
Vertical | 5/16” x | |
Lag screws | ||
track | ||
| ||
Jamb |
| |
bracket |
| |
| Flag angle lag screw locations | |
| 3/8” to 5/8” | |
| Spacing | |
Bottom | Bottom section | |
section | ||
| Vertical track |
8 | Stacking Sections | |
Tools: Power drill,7/16” Socket driver | ||
|
Note: Refer to door section identification.
Note: Make sure hinges are flipped down, when stacking another section on top. Place rollers into end hinges of remaining sections.
With assistance, lift second section and guide rollers into the vertical tracks. Lower section until it is seated against bottom section. Flip hinges up. Fasten intermediate hinge(s) first, then end hinges, using
Important: Push & hold the hinge leafs securely against the sections while securing with
Note: Install lock at this time (sold separately). See optional installation step, Side Lock.
| Lock section |
|
Vertical |
|
|
tracks |
|
|
| ||
Left | Intermediate | Right |
end hinge | hinge(s) | end hinge |
9 | Top Brackets | |
Tools: Power drill, 7/16” Socket driver | ||
|
Align the top bracket base atop the corner of the top section and even with the edge of the section. Fasten to section through end cap using (4)
(4) | Top bracket base |
Self drilling screws | |
| |
| Carriage bolt |
Roller | Top bracket slide |
| |
| |
| End cap |
10 | Top Section | |
Tools: Hammer, Step ladder, Tape measure | ||
|
Place the top section in the opening. Temporarily secure the top section by driving a nail in the header near the center of the door and bending it over the top section. Now, flip up the hinge leaves, hold tight against section, and fasten center hinges first and end hinges last (refer to step, Stacking Sections). Vertical track alignment is critical. Position vertical track assembly’s flag angle between
Important: the dimension between the flag angles must be door width plus
Complete the vertical track installation by tightening the other lag screws. Push the vertical track against the rollers so that the rollers are touching the deepest part of the curved side of the track as shown; tighten all the track bolts and nuts. Repeat for other side.
Door width |
+ |
Flag angle |
Nail |
Top section |
to |
Flag |
angle |
Top |
section |
Vertical track |
against rollers |
11 | Operator Bracket | |
Tools: Power drill, 7/16” Socket driver, Tape measure | ||
|
Important: When connecting a trolley type garage door opener to this door, a
the top section of the door if one has been provided, along with any
Uninstall the centermost hinge connecting the top section to the one below by removing the
Connect the upper half of the operator bracket to the lower half using (4)
Slide the top of the upper half of the operator bracket under the
Note: If your door lacks a
Position the bottom half of the operator bracket so that its hinge is located at the section joint between the top section and the one below. The bottom two holes should be on the section below the top section and the two holes above should be on the top section. Attach using (4)
Note: When attaching operator bracket to top section with
8
Please Do Not Return This Product To The Store. Contact your local
refer to your local yellow pages business listings or go to the Find a Dealer section online at