Cecilware ME10-GN, ME15-GN operation manual Installation and Operating Instruction

Page 4

ASSEMBLY: The four legs and vent cap drain are packed separately with the water boiler. Install legs by tilting the water boiler on its side and screwing the legs into the leg supports until hand tight. Carefully right the unit and install in its permanent location, being sure to leave at least 6” on the right side of the water boiler for access to the control box. Level the unit by adjusting the bottom pad of the legs. Place the vent cap into the recess in the top of the unit. Mount the faucet assembly onto the shank in upright position.

INSTALLATION AND OPERATING INSTRUCTION:

PRE-INSTALLATION INSTRUCTIONS: The installation of your water boiler must be made by a licensed plumber and the installation must conform with State and Local Codes or in absence of Local Codes, with the National Fuel Gas Code ANSI Z223.1 a latest version.

AIR SUPPLY AND VENTILATION: Adequate ventilation and air supply must be provided in order for the water boiler to operate properly and efficiently. The area in front of and above the unit must be clear to avoid any obstruction of flow of combustion and ventilation air. DO NOT under any circumstances, connect the water boiler flue directly to a building exhaust system or place the flue outlet directly into the plenum of the exhaust hood as it will adversely affect the gas combustion of the water boiler.

CLEARANCES: Your water boiler is design certified to use on combustible floors. The

side and back clearances for combustible constructions are as follows: 6 inches from side and 8 inches from back. The water boiler must be installed with 4 inch high legs provided.

GAS CONNECTION: Before connecting the water boiler to the gas line Examine the gas specification label attached to the right side panel to be certain that the type of gas for which the unit is equipped is the same as the gas supply. A 3/8 NPT gas connection is needed to connect the unit to the gas line. An accessible manual shut-off valve must be installed in the gas supply line in case of an emergency. The gas supply pipe must be sized to accommodate all the gas fired equipment that may be connected to it. Check with your local Gas Company as to proper pipe size. Sealant on all pipe joints must be resistive to propane gas. Before attempting to light the water boiler, check all joints for gas tightness using a soap and water solution.

WATER CONNECTION: The unit is supplied with ¼” flare fitting. Connect the copper tubing with the flare fitting to the water connection at the rear of the machine. The water line must have a shut-off valve (supplied by a plumber) to a cold water supply. Water pressure should be 20 lbs. minimum for proper operation.

NOTE: Connecting the unit to a warm water supply will speed by heating and recovery time.

To turn on the water supply valve plug the line cord into a dedicated 120V grounded receptacle (NEMA 5-15R). The water will start entering the unit and automatically fill it to capacity.

PRIMING OR INITIAL FILLING: Turn on the water supply. The unit fills at the rate of 1 gallon per minute. When the water level becomes visible in the sight gauge, turn the thermostat knob to the ON position. The boiler will now automatically fill to capacity and heat the water.

LIGHTING AND ADJUSTMENT: Water must be visible in the sight glass before lighting to pilot. Turn the thermostat knob to its lowest position. Turn gas cock dial to PILOT position. Depress gas cock dial and light pilot with a long lighted match through the opening located on the bottom of the urn. Hold in depressed position for approximately 30 sec. or until pilot remains lit when dial is released.

3

Image 4
Contents Automatic GAS Water Boiler Electrical Specifications Page Installation and Operating Instruction For Qualified Service Personnel only Air Shutter Page Page ORIFICE, LP LP Units only Component Tests Cecilware Corporation