Burnham manual V9 Series Piping Recommendations, PIpInG SIZe In InCHeS, Qty. SIZe

Page 6

V9 Series Piping Recommendations

Water and Steam

WATeR BOILeR pIpInG

To be used when system return water is not less than 135° F for prolonged periods of time and system flow does not impact flow through the boiler

 

SUppLy pIpInG SIZe

 

ReTURn pIpInG SIZe (In.)

 

 

 

 

 

 

 

 

ReTURn

ReTURn BRAnCH

 

(In.) (1)

ReTURn (2)

 

 

 

HeADeR (2A)

(QTy.) SIZe (2B)

 

 

 

 

 

MODeL

 

 

20¡F

40¡F

 

20¡F

20¡F D ROp

40¡F D ROp

DROp

DROp

20¡F D ROp

DROp

 

 

 

 

 

 

 

V903A

2

1-1/2

2

1-1/2

Ñ

Ñ

V904A

2

1-1/2

2

1-1/2

Ñ

Ñ

V905A

2

1-1/2

2

1-1/2

Ñ

Ñ

V906A

2-1/2

1-1/2

2-1/2

1-1/2

Ñ

Ñ

V907A

2-1/2

2

2-1/2

2

Ñ

Ñ

V908A

2-1/2

2

2-1/2

2

Ñ

Ñ

V909A

3

2

3

2

Ñ

Ñ

V910A

3

2-1/2

3

2-1/2

Ñ

Ñ

V911A

3

2-1/2

3

2-1/2

Ñ

Ñ

V912A

4

2-1/2

4

2-1/2

3

(2) 3

 

 

 

 

 

 

 

NOTES:

1.All piping is schedule 40.

2.Pipe sizes listed are based on a 20°F or 40°F differential

(temperature drop). Select one to match application. Consult factory if boilers are used in low temperature applications or blending/mixing devices.

3.When specified return piping size is less than 3”, install 3” X 12” nipple and appropriate size bell reducer directly into boiler return tapping as shown.

4.Drain valve — ball valve preferable, gate valve acceptable alternative (supplied by others).

- Minimum valve size per ASME code is 3/4” NPT

5.For multiple water boiler piping, consult factory.

STeAM BOILeR pIpInG

 

 

 

 

 

 

 

RISeR SpACInG

 

 

 

pIpInG SIZe (In InCHeS)

 

(InCHeS)

 

 

 

 

 

 

 

 

 

RISeR

 

HeADeR &

ReTURn

eQUALIZeR

 

 

MODeL

(Qty.) SIZe (1)

 

SUppLy (2)

(3)

(4)

'A'

'B'

 

 

 

 

 

 

 

 

 

V903A

(1)

3

 

3

1-1/2

2

Ñ

Ñ

V904A

(1)

4

 

4

2

2

Ñ

Ñ

V905A

(1)

4

 

4

2

2

Ñ

Ñ

V906A

(1)

4

 

4

2-1/2

2-1/2

Ñ

Ñ

V907A

(2)

4

 

6

2-1/2

2-1/2

36

Ñ

V908A

(2)

4

 

6

2-1/2

2-1/2

42

Ñ

V909A

(2)

4

 

6

2-1/2

2-1/2

48

Ñ

V910A

(2)

4

 

6

3

3

54

Ñ

V911A

(2)

4

 

6

3

3

60

Ñ

V912A

(3)

4

 

6

3

3

30

36

 

 

 

 

 

 

 

 

 

nOTeS:

1.All piping is schedule 40.

2.To prevent condensate from being trapped in header, do not reduce equalizer elbow at header connection.

3.Drain/blowoff valve — ball valve preferable, gate valve acceptable alternative (supplied by others).

Minimum valve size per ASME code is 3/4” NPT 903A/905A; 1” NPT 906A/910A; 1-1/4” NPT 911A/912A.

ÐIncreasing the valve size will improve the blowdown operation.

ÐIn all cases, piping connection blowoff valve to boiler should be full size to the point of discharge.

4.For pumped return systems, see V9A installation manual.

5.For multiple steam boiler piping, consult factory.

6

Image 6
Contents V9Series Installation & Service Flexibility American-Made Cast Iron ConstructionÐ BC25-HSiV9 Series Hot Water or Steam Boiler Commitment to QualitySBC SBCª Boiler Control SystemV9 Series Dimensions V9 Series Piping Recommendations PIpInG SIZe In InCHeSQty. SIZe GAS BURneRS V9 Series BurnersOIL BURneRS GAS/OIL BURneRSV9 Series Ratings Equipment Listing STAnDARD eQUIpMenTOpTIOnAL eQUIpMenT