SECTION 3
Installation & Assembly
FIGURE 2: Ener-Radiant XL Overview Key
Burner Housing Must always be installed horizontally.
10' 2=1/2"
Tube and Reflector Hanger | Tube and Reflector Hanger |
Install immediately after first | Suspend system from these hangers. |
coupling. | Minimum two (2) required per tube. |
Reflectors |
| Heat Exchange Tubes | |
Alternate overlap as shown |
| ||
ALUMINIZED | Supplied in 10 ft. lengths. | ||
on overview. Length of | |||
|
| ||
|
| ||
reflector and amount of |
|
| |
overlap is indicated. |
|
|
Turbulator Assembly
Enerco normally ships
Where Field Changes Occur
Turbulator Sections and Adapter are available in sections and must be assembled before installation (See Figure 7 for details). The number of sections required is indicated.
Tube Coupling Assembly
Coupling should be oriented with slide bar on top, and all couplings should “point” in the same direction.
Vent Adapter
Used to attach the heat exchanger tubing to vent pipe.
Suspensions Point
Use
Figure 2a: Ener-Radiant XL Model ERXL-60, ERXL-80S, Assembly Overview
20 ft. Exchanger length. 21 ft. - 4 in. Total Heater length. 4 Suspensin points indicated.
HANGER | HANGER | HANGER | HANGER |
18” | 18” | 18” | 18” |
|
|
| |
10’ |
|
| 10’ |
|
| ALUMINIZED |
|
| ALUMINIZED |
|
|
|
|
| (4) Turbulator Sections |
|
|
| (1) Turbulator Adapter |
FIGURE 2b: Ener-Radiant XL Model ERXL-80, Assembly Overview
30 ft. Exchanger length. 31 ft. - 4 in. Total Heater length. 6 Suspension points as indicated
18” | 18” | 18” |
|
| 18” | 18” | 18” |
| 10’ |
|
| 10’ |
| 10’ | |
| ALUMINIZED |
| ALUMINIZED |
|
| ||
|
|
|
|
|
|
| (4) Turbulator Sections |
|
|
|
|
|
|
| (1) Turbulator Adapter |
| Enerco enerRadiant® XL Series Heater | 12 | Operating Instructions and Owner’s Manual |