Sears P/N93SR-D02 owner manual Complete this adjustment before installing front panel

Page 3

!

IMPORTANT

INSTALLATION

INSTRUCTIONS

1

 

 

MAN( _At. VERTIC_.[\i'F.R

AD,I! LqTMF.NT

Complete this adjustment before installing front panel

1. Adjust the vertical louvers to the straight

position by using the handle,

2., The control panel and knobs are packed

separately. To install them, refer to installing "Front to Unit" in this manual.

Front InstalLation

install the front panel with filter as follows:

1. Adjust the horizontal louvers to the straight

position. Hold the front straight until the vertical

louver handle lines up between the bottom

horizontal louver and the discharge opening.

2o Press the front stralght onto the cabinet until the

holes in the flangeofthe plasticfront lineupwlth the

screw holes in the metal cabinet. Fasten the front in

place with the two screws provided°

Verlical Louver

Unit Cover

Screw

Handle

Fronl Panel

 

Horizonta{ Louver

3

Image 3 Contents
Kenmore Automatic Air Conditioner Contents Installation Instructions Complete this adjustment before installing front panelInstalling Front to Unit Vent Control Starting Using Your NEW AIR ConditionerAIR Direction Super Thrust AIR ControlHOW to Lower Your Cooling Costs Cleaning and Replacing the AIR FilterAvoid Service Checklist Service Checklist Possible Cause Solution AvoidOccurrence OPEN/EXHAUST OccurrencepossiblecauseOiling of the FAN Motor Cleaning the Cabinet FrontCleaning the Inside of Your AIR Conditioner Repairing Paint DamageKeep this Manual for Ready Reference NOW and Later KIT PartsPage Page Page Kenmore Automatic Air Conditioner WE Service What WE Sell