American Standard T005.730 Trim Installation, Handle Installation, Temperature Calibration

Page 2

1 TRIM INSTALLATION

1

2

3

Push CAP (1) over the O-RING SEAL (2).

Push ESCUTCHEON HOLDER (3) with lightly greased

 

 

O-RING SEAL (4) over CAP (1).

 

 

Attach the FIXATION PLATE (7) to the ESCUTCHEON

 

 

HOLDER (3) with the two SCREWS (5) provided.

GREASE ESCUTCHEON

4

 

Push ESCUTCHEON (6) flush against finished wall.

O-RING SEAL

7

6

2 HANDLE INSTALLATION

2

 

 

 

Install HANDLE BASE (1) onto TEMPERATURE CONTROL KNOB (2)

 

4

Install HANDLE ADAPTER (3) onto HANDLE BASE (1) and tighten

 

 

with SCREW (4).

 

 

Align HANDLE (5) and push onto HANDLE ADAPTER (3).

6

 

1

5

 

Tighten SET SCREW (6) in handle with HEX WRENCH (7) SUPPLIED.

3

7

 

 

 

3 TRANSPOSED SUPPLY PIPING OR BACK TO BACK INSTALLATION

Should the hot and cold water supply pipes have been transposed making adjustment impossible, proceed as follows:

Shut off water supply.

Remove handle and rim

Remove check stops and re-install them transposed.

Important note: RED CHECK STOP is now on the right of the mixer body and the BLUE CHECK STOP is now on the left.

Turn the water supply back on and perform the temperature adjustment in step 4.

CHECK STOP

(RED TO BLUE)

CHECK STOP

(BLUE TO RED)

4 TEMPERATURE CALIBRATION

Check that arrow marking B points vertically upwards. If not, push the BLACK CLAMP (1) on the SECURING RING (2) to the right, pull off KNOB MOUNT (3) and reinstall KNOB MOUNT (3) with arrow "B" pointing upwards.

SET HOT LIMIT STOP

4

 

 

The maximum mixed water temperature is set at 109˚F at the factory.

 

 

 

 

 

 

This setting can be changed if desired.

 

 

Remove the TEMPERATURE LIMIT STOP (4) (H shaped Black Plastic part). Reinstall it at the desired notch as indicated in the diagram to limit the maximum mixed water temperature to 104˚F or 112˚F.

For 100˚F adjustment, turn the water supply on. Turn KNOB MOUNT (3) until the spout temperature is 100˚F. Check that arrow marking A on the KNOB MOUNT (3) still points upward after adjusting the thermostat to 100˚F. If not, pull out the RED LOCKING DEVICE (5). Remove KNOB MOUNT (3) without turning by sliding out as indicated by the arrow.

Reinstall the KNOB MOUNT (3) so that the arrow marking A points upwards. Reinstall RED LOCKING DEVICE (5).

ARROW

1

"B"

 

 

ARROW

 

"A"

104

 

109

3

112

 

2

5

5 OPERATING THE VALVE

Turn on water supply on and test installed fitting.

If the system is delivering all Hot or all Cold and no mixed water the pipes are probably transposed. See step 3 for TRANSPOSED SUPPLY PIPING.

Operate valve from off to cold to hot. Check temperature. If max mixed water temperature is to hot or to cold see step 4 and re-calibrate the valve.

HOT

COLD

OFF

M 9 6 8 0 1 4

Image 2
Contents Care Instructions ROUGHING-IN DimensionsRecommended Tools Do notTransposed Supply Piping or Back to Back Installation Trim InstallationHandle Installation Temperature CalibrationEscutcheon KIT Escutcheon HolderFixation Plate CAPInstructions D’ENTRETIEN Outils recommandésMesures Relatives AUX Points DE Raccordement Conduite D’ALIMENTATION Inversée OU Installation DOS À DOS Installation DE LA GarnitureInstallation DE LA Poignée Calibrage DE LA TempératureEnsemble DE Rosace Support DE RosacePlaque DE Fixation VIS DE RosaceInstrucciones Para EL Cuidado Dimensiones DE InstalaciónHerramientas recomendadas Tuberías DE Suministro Transpuestas O Instalación Recíproca Instalación DE LA MolduraInstalación DE LA Manija Calibración DE TemperaturaTornillos DEL Chapetón Sujetador DEL ChapetónTapa Juego DEL Chapetón