3Com TECHD-0000000050 manual System Grounding Requirements, Cabling Requirements

Page 15

System Grounding Requirements

Damage from Electromagnetic Static Discharge (ESD) can occur when electronic components are improperly handled. Its results can be complete or intermittent system failures. Therefore, proper ESD protection is required whenever you handle IPS devices and equipment. It is not necessary to open the UnityOne ZPHA chassis to add or remove any components.

Note: When you install the ZPHA, you do not need to modify or open the IPS chassis. You will only need to connect cables during installation procedures.

Cabling Requirements

The UnityOne ZPHA requires the following cables:

USB cable — 1 cable for connecting to the IPS to receive power (included with device)

RJ-45 copper network cables — 4 cables are required per segment:2 for IPS connections and 2 for network connections. (cables not included)

LC-LC Simplex Multi-mode Fiber cables — 4 per segment (included with device). Additionally, you should have 4 cables currently with your IPS device to connect to the ZPHA and/or Ethernet switch.

Note: For Simplex Single-mode Fiber cables, contact a TippingPoint Sales

Representative.

Unpack the UnityOne ZPHA

Each system chassis is securely packaged in a shipping box.

CAUTION: ESD can damage the UnityOne if you do not take necessary precautions. Installation and maintenance personnel should be properly grounded using ground straps to eliminate the risk of ESD damage to the equipment.

Use caution when opening the UnityOne boxes.

To unpack the ZPHA system, complete the following steps:

STEP 1

STEP 2

STEP 3

STEP 4

Inspect the packing container. If you see any damage or other signs of mishandling, inform both the local freight provider and TippingPoint before unpacking. Your freight provider can provide you with the procedures necessary to file a claim for damages.

Carefully open the box.

Remove all packing material.

Verify the contents in the shipping package. Compare the packing list to your shipment and to your order. Are all items included? If items are missing, contact your TippingPoint sales or field representative.

UnityOne Modular Fiber/Copper ZPHA Installation Guide V 2.1

3

Image 15
Contents UnityOne Modular Fiber/Copper Zpha Installation Guide Page Table of Contents Page Target Audience OverviewConventions OrganizationMessages Tip UnityOne Documents Audience Publication Location Related DocumentationCustomer Support UnityOne SMS Web Services APIYour Zpha serial number UnityOne Modular Fiber/Copper Zpha Installation Guide V Prepare the Site Safety RequirementsEnvironmental Requirements Power RequirementsRack and Clearance Requirements LocationSystem Grounding Requirements Cabling RequirementsUnpack the UnityOne Zpha Remove the chassis from the box Zpha Installation Zpha Components Description Zpha Hardware OverviewModular Zpha Front Panel without segments Following image displays the Fiber Segment Module Blank Faceplate Segment Module Zpha InstallationInstall the Zpha Case and Modules Connect Fiber Cables Connect Copper Cables Connect USB Power 10 Zpha Cross-over Configuration Cross-over Cable Installation11 Zpha Cross-over Configuration 12 Zpha Cross-over Configuration 13 Zpha Cross-over Configuration UnityOne Modular Fiber/Copper Zpha Installation Guide V Index UnityOne Modular Fiber/Copper Zpha Installation Guide V