Enviro C-11023 owner manual Table of Contents

Page 2

Table of Contents

 

Introduction

3

Rating Label Location

3

Pellet Quality

3

Important Safety Data

4

Safety Warnings And Recommendations

4

Operating Instructions

6

Control Board Functions

6

Automatic Safety Features of Your Pellet Stove

6

Operating Your Pellet Stove

7

Turning Your Pellet Stove Off

7

Routine Cleaning and Maintenance

8

Installation

11

Deciding Where to Locate your Pellet Appliance

11

Removing Pellet Stove From Pallet

11

Appliance Dimensions

12

Clearances to Combustibles

13

Alcove Clearances

13

Hearth Pad Pedestal Installation

14

Vent Termination Requirements

15

Outside Fresh-Air Connection

16

Exhaust And Fresh Air Intake Locations

16

Mobile Home Installation

17

Corner Through Wall Installation

17

Horizontal Exhaust Through Wall Installation

18

Through Wall With Vertical Rise and Horizontal Termination Installation- Recommended

19

Through Concrete Wall With Vertical Rise Installations

19

Inside Vertical Installations

20

Outside Vertical Installations

20

Hearth Mount Installation

21

Exterior Mounted Exhaust Blower

22

Typical Through Wall With Exterior Blower Kit Installation - Horizontal Termination

23

Typical Through Wall With Exterior Blower Kit Installation - Vertical Termination

24

Thermostat Installation

25

Optional Slider/Damper Installation

25

Slider/Damper Set-Up

26

Troubleshooting

27

Fuses

29

Wiring Diagram

30

Parts List

31

Parts Diagram - Components

33

Parts Diagram - Steel

34

Warranty

35

Installation Data Sheet

36

2

Image 2
Contents Evolution Table of Contents Store pellets at least 36 1 m away from the pellet stove IntroductionI. Pellet Standards USE of Cordwood is Prohibited by LAW Keep ASH PAN Free of RAW Fuel Reasons WHY the Unit Overheated Operating InstructionsThermostat / Switch Mode Initial START-UP See aboveBurner POT and Liner 2-3 days Routine Cleaning and MaintenanceTools Required to Clean Unit Heat Exchanger Tubes 2-3 daysFresh AIR Intake biannually Door Glass Cleaning 2-3 daysASH PAN weekly Exhaust Passages biannuallyDoor Glass Replacement Post Season CLEAN-UPCleaning Plated Surfaces Brick PanelInstallation Screws to take out to remove stove from pallet147 mm Maximum Alcove depth Inches Installing Hearth Pad Pedestal onto EF5 Vent Termination Requirements Exhaust Fresh Air Intake Horizontal Exhaust Through Wall Installation Elbow with a rodent screen may Inside Vertical Installation Outside Vertical Installation Through vent hole Exterior Blower KitThrough Wall Installation with Exterior Blower Kit EF5 If you wish to adjust the slider damper externally not REQUIRED, please follow the instructions belowSpecial Notes Slider/Damper Plate in UnitDo not TroubleshootingStove will not operate when hot What to do ifLight # 2 on Heat output bar flashing 200 F 93 C high limit temperature sensor has trippedExhaust motor will not function normally Ignitor- the pellets will not light Control settings Heat Level has no effect on the fireConvection blower will not function normally Stove keeps going outWiring Diagram 5V DCParts List Reference Number Description Part NumberParts List Parts Diagram Components SteelDiagramParts To the Distributor WarrantyTo the Dealer Installation Data Sheet Name of Owner Address