Crown CSHB60-90XE operation manual Eac

Page 3

All installations and services must be performed by qualified service personnel.

I.BLOWER CONTROLLER INFORMATION

A. TERMINAL DEFINITIONS & FIELD WIRING

 

 

Burner Harness Connector P1

 

 

 

Pin

1 –

Limit switch connection.

 

 

Pin 2 –

120 VAC Line connection.

 

 

Pin

3 –

Burner pilot contact.

 

 

 

Pin 4&5 – 120 VAC Neutral connection.

 

 

Pin

6 –

Burner pilot contact.

 

 

 

Pin

7&8 – From oil primary control.

 

 

Pin

9 –

Limit Switch Input (LSI).

 

 

Field Wiring to Burner

Pilot (Tstat)

Neutral

Line

 

 

 

 

 

Harness Wires

Yellow Wires

White

Red

 

 

Beckett Connections

T-T terminals

White

Black

 

 

Riello Connections

 

 

 

 

 

T-stat terminals

White

Black

 

 

Carlin Connections

T-T terminals

White

Black

Thermostat/Humidistat connections

 

"C"

Common/ground

 

"W"

Thermostat call for heat

"R"

24 VAC to thermostat

"G"

Thermostat call for fan

"Y"

Thermostat call for cool

“DEHUM”

Humidistat call for dehumidification

ECM control outputs

 

 

Pin 1 - Speed Common

Pin 4 – Blower Enable

Pin 2 - Speed Output

Pin 5 – COOL Enable

Pin 3 - Not used.

 

Pin 6 – “R” Output

Male quick connect terminals.

 

"S1-3”

120 VAC Hot

 

“N1-7”

120 VAC Neutral

 

“EAC”

Electronic Air Cleaner (120 VAC) connection.

“HUM”

Humidifier connection (120 VAC).

"FAN"

Fan On Signal

 

“X”

24VAC from transformer.

“C”

24VAC common from transformer.

"CC"

Compressor Contactor

"CC_COM"

Compressor Contactor Common

1

Image 3
Contents Model Index Section Beginning EAC Board Layout with Switches Wiring & SwitchesOutputs Operating Modes Blower Delay CFM Tables Heating Speed Set-upsCooling Speed Set-ups II. ECM Trouble Shooting A. Diagnostc Features General Guidelines to Troubleshooting GE ECM Driven SystemsSymptom CAUSE/PROCEDURE DON’T Excessive noiseEvidence of Moisture Perform Moisture CheckComfort Check Troubleshooting ChartsYES Is There Supplied to MOTOR? Disconnect 16 PIN Sequence of Operation ECM PSC Replacement