Installation Checklist
A. Water Heater Location
❑Close to area of heated water demand.
❑Indoors and protected from moisture, wet conditions and freezing temperatures.
❑Area free of flammable vapors.
❑1,000 cu. ft unconditioned indoor space.
❑Provisions made to protect area from water damage.
❑Sufficient room to service heater.
❑Eight inches (8") of clearance from ceiling to top of heat pump water heater to allow for air circulation.
❑Access to condensate disposal.
B. Water Supply
❑Water heater completely filled with water.
❑Air purged from water heater and piping.
❑Water connections tight and free of leaks.
C. Relief Valve
❑Temperature and Pressure Relief Valve properly installed and discharge line run to open drain.
❑Discharge line protected from freezing.
D. Wiring
❑Power Supply voltage agrees with water heater rating plate.
❑Branch circuit wire and fusing or circuit breaker of proper size. (Minimum 30 amp breaker)
❑Electrical connections tight and unit properly grounded.
❑10 gauge wire.
E. Condensate Lines
❑Condensate lines from heat pump installed correctly.
❑Condensate lines from heat pump run to a suitable drain location.
11