Bosch Appliances 125X NG Installation Checklist Model GAS Line Size, Controlled Energy Corp

Page 16

 

 

 

INSTALLATION CHECKLIST

 

 

 

 

 

MODEL 125X

 

 

 

GAS LINE SIZE

 

 

 

 

Natural Gas

 

 

Nominal Iron Pipe Size*

 

1/2"

 

3/4"

1"

 

MAXIMUM LENGTH

 

10'

 

40'

150'

 

 

 

Liquid Propane

 

 

Semi-rigid Tubing

 

1/2"

 

5/8"

3/4"

7/8"

MAXIMUM LENGTH

 

NOT

 

20'

60'

150'

RECOM MENDED

 

 

 

 

* Flex tubing greatly reduces capacity and, therefore, is not recommended.

Minim um Vent Size* and Height

 

Minimum D iameter

 

 

 

Minimum Height**

 

5 inches

 

 

 

 

6 feet

 

* NOTE: V ent size must not be restricted. Installation must com ply with national fuel gas code venting

requirem ents for a 117,000 B tu Category I appliance and any applicable local codes .

** NOTE: Minimum vent height m ust be 6 feet, provided there are no elbows . Termination of the vent must be 2 feet above any obstructionwithin a 10 foot radius of vent pipe. Consult your gas utility or National Gas Fuel Code if vent will have elbows or share venting with another appliance. The vent connector should have as m uch vertical rise as possible (minimum 12") before any horizontal run.

Water Pressure

For installation on well system s, insure that your water pressure is between 30 - 50 psi.

MAINTENANCE TABLE see page10

 

 

EVERY YEAR

EVERY 2 YEARS

EVERY 3-5 YEARS

 

 

 

 

 

 

LUBRICATE WATER VALVE

 

 

 

 

 

 

 

 

REBUILD WATER VALVE

 

 

 

 

 

 

 

 

INSPECT WATER FILTER SCREEN

 

 

 

 

 

 

 

 

INSPECT PILOT ASSEMBLY

 

 

 

 

 

 

 

 

INSPECT VENT ASSEMBLY

 

 

 

 

 

 

 

 

INSPECT MAIN BURNER

 

 

 

 

 

 

 

Replacement Parts available from North American

Distributor

CONTROLLED ENERGY CORP.

340 Mad River Park

Waitsfield, Vermont 05673

Phone 800-642-3111

Fax (802) 496-6924

www.controlledenergy.com

techsupport@controlledenergy.com

Recycled paper

VULCANO Termodomésticos S.A.

Estrada de Cacia

3801 - 856 Aveiro - PORTUGAL

©2001ControlledEnergyCorporation,Waitsfield,VT allrightsreserved

Image 16
Contents Table of Contents For Your SafetyWhat to do if YOU Smell GAS Features AquaStar 125X LP and 125X NG SpecificationsUnpacking the Aquastar Heater Principle of OperationAquastar Model Where IT could Freeze Proper Location for Installing Your HeaterGeneral Rules to Follow For Safe Operation Combustion AIR Requirements Mounting InstallationClearances Venting To check the draftGAS Line Sizing Maximum Inlet GAS Flow Pressure SettingAltitude Natural Gas Liquid Propane Water Connections For Your Safety Read Before Operating Your HOT Water HeaterOperating Instructions Lighting and Operating Instructions Setting the Water TemperatureTo Turn OFF GAS to Appliance Maintenance and Service Review Maintenance Table on the Back of this ManualDo not enlarge the orifice IntroductionNo Spark AT the Pilot HOT Water Temperature Fluctuates / Unit Deactivated Pilot Sparks Continuously with no Water RunningPilot Lights but Burners will not Come on Water is TOO HOTSee page 2 and 7 for correct specifications Gas pressure is too lowInterior Components Diagram and Parts List Interior Components Diagram Parts List Installation Checklist Model GAS Line Size Controlled Energy Corp