GE PNRV18, PNRQ15 Connecting to the Icemaker, Formodels GXRV10, GXRM10, PNRV12, Titting ,,1

Page 2

CONNECTING TO THE ICEMAKER

L Locate the 3/8" robing that supplies file product water to ltle

RID fauco. It will be bhm, gray or white, depending on tile

model. DO not confuse the product water tubing with the drain water tubing that also goes to the faucet (black or white on most

models), At a convenient point between tile faucel and the

eleclronics box (oil mine models), cut tile robing and install tile second Tee filling. Connect one end of the 33-foot lenffih of blue robing a_sshown in Fig. 4.

FORMODELS GXRV10, GXRM10, PNRV12

2.Turoofficemakerwatersuppl_Disconnectdmwatersource tubing from dm reffigeralor.

3.Connect lhe brass tubing adapter to tile flee end of the

3Nfoot length of bhm tubing. Shorten tubing to desired lengfll. Attach the other end of file adapter to the icemaker water valve. Be sure lo install tile plastic washer into tile tubing adapter as shown in Fig. 5.

SANITIZING THE SYSTEM FOR MODELS GXRV10, GXRM10, PNRV12

See your Reverse Osmosis System Owner's Manual for complete

Sanitization Instructions.

L Remove lhe sumps. ReInove the filters and place in a clean plastic bag. flit has been six months since y_u last replaced fillers, go ahead and discard dram and replace wilh new fillers.

2 Thoroughly wash sumps with dish soap. Thoroughly wipe

inside of head wifll a paper towel moistened wifll dish soap. Rinse well.

3.Remove cap froIn RID cartridge housing. ReInove the RID

cartridge mid place in a cleml plastic tyag. Thoroughly wipe inside the housing and cap with a gaper towel or dish brash moistened wiflldish map. Rin_ well.

4, Replace empty poslfilter suInp and RO housing cap.

5, Fill prefilter sunlp with water to wilhfil 1ppof o-ring. Add 2 oz.

(4 Tbsp.) of ordinary household bleach. Replace prefilter

sump.

6.Make sure t_th tanks are sitting al tile _me elevation.

Olherwi_, Ihe higher tank may not be _nitized properly. Turn oil water supply. Open RO faucet until water begins m flow, then close. Allow system to fill fbr one minute.

Z Open Ihe faucet and allow water to flow for 10 minutes. Clo_ f_tucet fi)r one minute more, Ihen open mid allow water lo flow

for anolher 10 minutes, or until tile bleach odor is gone. "Ibm offwater supply again. Drain RO system.

8, Remove sumps. Inert fillers. Lubricate o-ring with food-grade

silicone g-tease, if necessa_. DO not use petroleum jellg Tighten sumps securely.

9.Remove cap from RO cartridge housing, lnslall RID carlridge,

o-ring end first. Lubricate cover o-ring wilh fbod%rrade silicone grease, if necessary. DO not use petroleum ]ellg Tighten cap securely.

10.TurIl oil water supply. Allow m fill. It may lake 4-8 hours m fill boil, ranks. Check for leaks,

11.If y_u replace die prefiher and postfiher, allow faucet m run a few lninules O reInove harmless carbon panicles.

12.Once storage tanks are filll, turn Oil icemaker, lfyou have a concern that some oflhe bleach water may have badkwashed inlo the iceInaker iIflet lines, discard Ihe first two balches of ice. Or, dr'din your dispenser tank until water IlO longer runs cold, and check for bleach taste and odor.

Br,tss robing adap_r

Hg.

3

 

 

 

 

4

 

 

 

 

 

This

tubing

adapter

can

be nsed

Product

 

On ill(k_t icvmakcrs.

Obtain

iwed¢.d

 

 

Tee

tilting

for

otheix.

 

 

_atcr tubv

 

 

 

 

titting ,,_1

To drain

point

supply _-alve

(on some medals)

Storage rank

J

Secondal'y storage tank

(included w5th R'_]glT)

Plastic

w&she r

Image 2
Contents Installation Instructions KIT ContentsSanitizing the System for Models GXRV10, GXRM10, PNRV12 Connecting to the IcemakerFormodels GXRV10, GXRM10, PNRV12 Titting ,,1Sanitizing the System for Models PNRQ15, PNRQ20 Shut Connecting the Auxiliary Tank for Model PNRV18Tile water supply valve Hg Lift tile lever oil IheConnecting to the Icemaker for Model PNRV18 For Model PNRV18 Be sure hands have been cleaned with an anti-bacterial soapSanitizing the System Chlorine will destroy the RO cartridge

PNRQ20, PNRV12, PNRV18, GXRM10, PNRQ15 specifications

The GE GXRM10, PNRV18, PNRQ15, PNRQ20, and GXRV10 are a series of advanced power systems designed to meet a wide range of industrial needs. Each unit brings a unique set of features, technologies, and characteristics that cater to various applications in the power generation and distribution industry.

Starting with the GE GXRM10, this model is known for its robust performance and reliability. It integrates advanced digital technology, allowing for real-time monitoring and control. Key features include modular design, which facilitates easy upgrades and maintenance. It also offers exceptional efficiency, reducing operational costs and minimizing environmental impact.

The PNRV18 model is engineered for enhanced energy management. Its defining characteristic is its ability to efficiently regulate voltage levels, contributing to a stable power supply. Equipped with smart grid capabilities, it supports integration with renewable energy sources, making it a forward-thinking solution for modern energy challenges. Furthermore, its compact design allows for flexibility in installation.

Meanwhile, the PNRQ15 and PNRQ20 models are designed for larger-scale industrial applications. Both units emphasize enhanced load handling capabilities, making them ideal for high-demand environments. These models feature advanced protection mechanisms, ensuring that they can handle fluctuations and surges in power without risking damage to the system. Their user-friendly interface provides operators with easy access to real-time data and analytics, facilitating informed decision-making.

Lastly, the GE GXRV10 stands out with its emphasis on versatility. It can be configured for a variety of operational conditions, providing solutions for both continuous and standby power needs. This model incorporates state-of-the-art communication technology, allowing for seamless integration with existing infrastructure. This adaptability is increasingly crucial as industries shift towards hybrid and decentralized energy models.

In conclusion, the GE GXRM10, PNRV18, PNRQ15, PNRQ20, and GXRV10 represent a significant leap in power system technology. Their innovative features and robust design not only enhance operational efficiency but also align with global trends towards sustainable energy solutions. Each model, with its unique characteristics, provides tailored solutions that meet the evolving needs of various sectors in the energy landscape.