Bradley Smoker installation instructions S19-220PT, S19-220BPT Installation

Page 2

S19-220PT, S19-220BPT

Installation

Installation

WARNING

Read this installation manual completely to ensure proper installation, then file it with the owner or maintenance department. Compliance and conformity to drain requirements and other local codes and ordinances is the responsibility of the installer.

THISE SID UP

Packing List

Separate parts from packaging and make sure all parts are accounted for before discarding any packaging material. If any parts are missing, do not begin installation until you obtain the missing parts.

Flush the water supply lines before beginning installation and after installation is complete. Test the unit for leaks and adequate water flow. Main water supply to the eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized shutoff.

The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI Z358.1.

The inspection and testing results of this equipment should be recorded weekly to verify proper operation. This equipment should be inspected annually to ensure compliance with ANSI Z358.1.

Workers who may come in contact with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI Z358.1.

For questions regarding the operation or installation of this product, visit www.bradleycorp.com or call 1-800-BRADLEY.

Product warranties may also be found under ”Product Information” on our web site at www.bradleycorp.com.

2

4/30/07

Bradley Corporation • 215-1251 Rev. B; EN 06-532G

Image 2
Contents Plastic Bowl Table of ContentsWall-Mounted Eyewash with Stainless Steel BowlS19-220PT, S19-220BPT Installation Assemble eyewash Connect water supplyAssembly of Components S19-220PT Plastic Bowl Flow Control This End IPS Supply Inlet 4 IPS Drain OutletAssembly of Components S19-220BPT Stainless Steel Bowl