Bradley Smoker S19-220PT, S19-220BPT Assemble eyewash, Connect water supply

Page 3

Installation

 

 

 

S19-220PT, S19-220BPT

Installation

S19-220PT

 

 

 

 

(394mm)

 

 

 

 

 

 

 

15-1/2"

Instructions

 

 

 

 

 

 

NOTE: Flush the water

 

 

7-3/8"

 

 

 

supply line before beginning

 

(187mm)

 

 

 

 

 

4"

 

 

 

installation.

 

 

(102mm)

 

 

Supplies Required:

 

(210mm)

(57mm)

 

 

 

 

 

8-1/4"

2-1/4"

 

 

(3) 3/8" wall fasteners

 

13-1/4"

 

5/16"

 

5-1/4"

and bolts

Ø10"

(337mm)

 

(8mm)

 

 

MTG.

133mm)

 

 

 

 

 

 

 

Pipe sealant

(254mm)

 

 

HOLE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Piping to 1/2" IPS water

 

 

 

 

 

 

supply inlet on unit

 

 

 

 

 

 

Sign-mounting hardware

 

 

 

 

 

15-7/8"

Step 1: Install inlet

S19-220BPT

 

 

 

 

 

 

 

 

(403mm)

 

 

 

 

 

drain fittings

 

 

 

 

 

 

NOTE: Top of eyewash heads

 

 

7-3/8"

 

 

 

should be 33"-45" (838mm-

 

(187mm)

 

 

 

 

 

4"

 

 

 

1142mm) from floor.

 

 

(102mm)

 

 

 

1. Position the inlet drain

 

8-1/4"

2-1/4"

 

 

 

fitting over the 1-1/4"

 

(210mm)

(57mm)

 

 

 

 

 

 

 

 

 

13-5/8"

 

5/16"

 

 

 

drain outlet pipe from

 

 

 

 

 

Ø10-3/4"

(346mm)

 

(8mm)

 

5-1/4"

 

wall.

 

 

HOLE

133mm)

 

(273mm)

 

 

 

 

 

 

 

MTG.

 

2. Using the inlet drain

 

 

 

 

 

 

 

fitting as a template,

 

 

 

 

 

 

 

mark the bolt hole

 

 

 

 

 

 

 

locations on wall OR

S19-220PT

 

 

 

 

 

 

install three suitable

 

 

 

 

 

 

&

 

 

 

 

 

 

fasteners (supplied by

 

 

 

 

 

 

S19-220BPT

36" (914mm)

 

 

 

 

 

installer) for 3/8" bolts

 

 

 

 

 

 

Suggested

 

 

 

 

 

in the wall at the

 

Height

 

 

 

 

 

marked hole locations

 

To Floor

4-1/2"

8-3/4"

30-1/2" (775mm)

 

 

 

 

(see Figure 1).

 

 

(114mm)

(222mm)

Suggested

 

 

 

 

Height

 

3. Bolt the inlet drain

 

 

 

 

 

To Floor

 

 

 

 

 

 

 

 

fitting to the wall or

 

13"

 

 

 

 

 

wall fasteners using

 

(330mm)

 

 

 

 

 

3/8" bolts (supplied by

Figure 1

 

 

 

 

 

 

installer).

 

 

 

 

 

 

 

 

 

 

 

 

Step 2: Assemble eyewash

1.Assemble eyewash components as shown in Figure 2 on page 4.

Apply pipe sealant (supplied by installer) to all male-threaded pipe joints.

Use a strap wrench around pipes when tightening to prevent marring.

Step 3: Connect water supply

1.Connect the water supply piping (supplied by installer) to the 1/2" IPS inlet on the eyewash.

2.Connect the P-trap and the tailpiece to the 1-1/4 IPS drain outlet on the eyewash.

3.Mount the safety sign to a wall or pipe using sign-mounting hardware (supplied by installer).

4.Open the water supply lines. Test for leaks and adequate water flow.

Bradley Corporation • 215-1251 Rev. B; EN 06-532G

4/30/07

3

Image 3
Contents Stainless Steel Bowl Table of ContentsWall-Mounted Eyewash with Plastic BowlS19-220PT, S19-220BPT Installation Connect water supply Assemble eyewashFlow Control This End IPS Supply Inlet 4 IPS Drain Outlet Assembly of Components S19-220PT Plastic BowlAssembly of Components S19-220BPT Stainless Steel Bowl