Mitsubishi Electronics PAC-YG31CDA Site Adjustment, 50A test run, PC connections and settings

Page 36

9.Site Adjustment

9.1Site Adjustment

When the task of site adjustment is subdivided into smaller tasks as shown in the figure below, the tasks can be broadly grouped into 3 steps. The benefit of following these 3 steps when carrying out the tasks of site adjustment is that if troubles do arise, it will be clear which step caused the problem. This makes it easier to solve problems and these results in a more efficient execution of site adjustment tasks.

Carry out site adjustment, by following the step-by-step instructions shown below.

Step 1 G-50A test run

Check that the air conditioners and controllers are correctly configured and that the air conditioner works.

Step 2 PC connections and settings

Connect and set up the software and hardware on the PC with BACnet IF installed.

Check that it is ready for operation.

For the test operation method of the air conditioner and centralized controller G-50A, refer to the relevant installation manuals.

Check that only the air conditioner test operation has been completed before starting Step 1.

See Chapter 5 in this booklet for details.

Step 3 BACnet IF system test run

Check that the Building Automation System can correctly operate air conditioner units of all the managed systems by issuing BACnet IF commands.

Building Automation System

Step 3

Ether BACnet

HUB

LAN

BACnet IF

Step 2

Power

supply unit

G-50A

Step 1

Step 1

33

Image 36
Contents Please read this manual before using the unit ………37 Test operation from BMS………36 Page Safety Precautions Relocating the unit you may result in incorrectMaking improper improvements or repairs may Other machinesPrecautions for General Usage Other PrecautionsSystem Requirements Requirements system recommendationsCompatible Airconditioner Restrictions Number of unitsChecking the G-50A version Updating the G-50ASystem Configuration System Configuration ExampleHardware Connection Diagram Group Configuration IC IC IC 01 02 IC IC 04Functional specification Object List List of the objects to be used is shown belowSupport Analog InputObject and Management Item Object Object type InstanceNumber Xxxx15 Inactive Permit Active Prohibit Filter reset Xxxx22 HorizontalSwing Air direction state Xxxx23 HorizontalService List Initiate Issue of serviceService Initiate Execute Execute Reception and execution of serviceService list for every object Standard support Setting change is possibleBACnet if transmits BACnet if receivesEvent Service specification Prohibition of local operation ModeFunction Object Object type EventSetting functional list Installation Pre-installation StepsPreparing for installation BACnet if Setup Starting the setup programSetup the serial No 1CD-ROM directory structureCheck the installation folder Setup completionClick the Finish button on the Setup Complete screen Check the program folderBACnet if Uninstall UninstallPart Names and Functions Window ElementsBasic Mouse Operation DragInitial Startup and Shutdown Before StartupStart up ShutdownPage System Setting Procedure Start Up SetBACnetShutdown SetBACnet Get/Put system settings Windows ElementsOpen/Close file Title barSystem Setting Procedure Setup for G-50AModify group configuration 2 G-50A NO. and IP-Address3 Add/Modify/Delete Group Add groupGroup setup Group Setup From G-50AInput the number of a group Select the model of a group ICIndoor unit LC Lossnay unitSetup for BACnet Communication setupNotification Setting COV notification setup COV Change Of ValueNotification Add COV notification addressEvent Notification Setting Modify notification addressDelete notification address Click the Delete button. The confirmation screen will openNotification Class Setting Notification Address SettingAdd notification class Add notification addressNotification setting parameter System Setup Unit Of temperatureUse Speed Type TimeSite Adjustment Site AdjustmentPC connections and settings 50A test runTools for Site Adjustment Test operation from centralized controller G-50AStep Initial setting of BACnet if PC using BACnet if For BMS network For G-50A systemModels IP address range 50A main unitSetting Check Time set Date and Time Is it set up correctly?Settings Is it in agreement with the IP address set as G-50A?Test operation from BMS Building Management System BACnet Interface PAC-YG31CDA Site Adjustment sheet IPaddress Group Number50A Number Was operated by BMS Appendix 1 Auto Log In Confirmation Method Appendix 2 Initial Value Page WT04221X03

PAC-YG31CDA specifications

Mitsubishi Electronics has long been recognized for its innovation and commitment to providing high-quality climate control solutions. The PAC-YG31CDA is one of the standout products from the company, designed to enhance the performance and functionality of air conditioning systems.

The PAC-YG31CDA is primarily used as a communication interface for centralized control settings in multi-split air conditioning systems. It allows for integration with various types of building management systems, making it an essential component in modern HVAC (heating, ventilation, and air conditioning) setups. This unit supports simplified control and monitoring, aiming to optimize energy use while maintaining user comfort.

One of the main features of the PAC-YG31CDA is its compatibility with a range of Mitsubishi air conditioning units, ensuring versatile application across different settings. This allows for centralized management of multiple indoor units, which is particularly useful in commercial environments. Users can easily adjust settings, schedules, and modes from a single interface, streamlining operations and enhancing convenience.

Another significant aspect of the PAC-YG31CDA is its advanced communication capabilities. It utilizes the proprietary MELCO communication protocol, ensuring seamless communication between the indoor and outdoor units. This capability is crucial for real-time monitoring and adjustments, which in turn promotes energy efficiency. The device can also be integrated with remote control units, offering users flexibility in managing their climate control preferences.

In terms of performance, the PAC-YG31CDA features a robust design that ensures reliability and durability. Its compact size allows for easy installation and integration into existing systems, minimizing disruption during setup. Furthermore, the unit is energy-efficient, designed to reduce operational costs while enhancing user comfort.

Overall, the Mitsubishi Electronics PAC-YG31CDA exemplifies the company's commitment to technical excellence and user satisfaction. With its comprehensive features, advanced technologies, and user-friendly design, the PAC-YG31CDA is an invaluable addition to HVAC systems, particularly in settings that require effective climate control management. Whether for commercial or residential applications, this unit stands out as a reliable solution that delivers both performance and value.