INSTALLING THE COOKER HOOD
Fitting the Wall Brackets
7.2.1
11 116 116
12a
650 min.
Wall marking:
X 1÷2
306
•Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the centre of the area in which the hood will be installed.
•Draw a horizontal line at 650 mm above the hob.
•Place bracket 7.2.1 on the wall as shown about
•Mark the wall at the centres of the holes in the bracket.
•Place bracket 7.2.1 on the wall as shown at X mm below the fi rst bracket (X = height of the upper chimney section supplied), aligning the centre (notch) with the vertical line.
•Mark the wall at the centres of the holes in the bracket.
•Mark a reference point as indicated at 116 mm from the vertical reference line and 306 mm above the horizontal reference line.
•Repeat this operation on the other side.
•Drill ø 8 mm holes at all the centre points marked.
•Insert the wall plugs (not supplied) in the holes.
• Fix the lower bracket 7.2.1 using the two screws (not supplied).
•Fix the upper bracket 7.2.1 and the air outlet connection support 7.3 together using the two screws (not sup- plied).
•Insert the two screws (not supplied) supplied in the hood body fi xing holes, leaving a gap of
Note: If the hood is to be installed onto a hollow construction or plaster or partition board wall then special fixing screws will be required (not supplied).
14