Bloomfield 9454, 9456 owner manual Leveling the Unit, PLUMBER’S Installation Instructions

Page 8

INSTALLATION

READ THIS CAREFULLY BEFORE STARTING THE INSTALLATION

IMPORTANT:

To enable the installer to make a quality installation and to minimize installation time, the following suggestions and tests should be done before the actual unit installation is started:

CAUTION:

ELECTRICAL

DAMAGE

DO NOT plug in or energize this appliance until all Installation Instructions are read and followed. Damage to the Brewer will occur if these instructions are not followed.

IMPORTANT: This equipment must be installed to comply with applicable federal, state and local plumbing codes and ordinances.

NOTE: Water supply inlet line must meet certain minimum criteria to insure successful operation of the brewer. Bloomfield recommends 1/4" copper tubing for installation of less than 12 feet and 3/8" for more than 12 feet from a 1/2" water supply line.

Unpack the unit. Inspect all components for completeness and condition. Ensure that all packing materials have been removed from the unit.

Read all instructions in this manual carefully before starting installation of this fryer. READ AND UNDERSTAND ALL LABELS AND DIAGRAMS ATTACHED TO THE DISPENSER.

Carefully account for all components and accessories before discarding packing materials:

1 ea. LID ASSEMBLY

1 ea. DRIP TRAY ASSEMBLY

1 ea. HOPPER MOUNTING TRAY

2 ea. HOPPER ASSEMBLY (9454) or

3 ea. HOPPER ASSEMBLY (9456)

1 ea. PRODUCT LABEL SHEET

1 ea. LITERATURE PACKAGE

Store these components in a convenient place for later use:

LEVELING THE UNIT

Set dispenser in its operating location. Level the dispenser.

A spirit level should be placed on the top of the unit, at the edge, as a guide when making level adjustments.

PLUMBER’S INSTALLATION INSTRUCTIONS

Brewer must be connected to a POTABLE WATER, COLD WATER line. Flush water line before connecting to Brewer.

DO NOT use a saddle valve with a self-piercing tap for the water line connection. Such a tap can become restricted by waterline debris. For systems that must use a saddle tap, shut off the main water supply and drill a 3/16” (minimum) tap for the saddle connection, in order to insure an ample water supply. Remember to flush the line prior to installing the saddle.

The brewer must be installed on a water line with average pressure between 20 PSI and 90 PSI. If your water pressure exceeds 90 PSI at anytime, a pressure regulator must be installed in the water supply line to limit the pressure to not more than 90 PSI in order to avoid damage to lines and solenoid.

A water shut-off valve should be installed on the incoming water line in a convenient location (Use a low restriction type valve, such as a 1/4-turn ball valve, to avoid loss of water flow thru the valve.

A water line strainer (not provided; ¼" flare "y" strainer available separately as p/n SA9052) must be installed in the supply line, between the shutoff valve and inlet fitting. Note FLOW arrow marking on strainer body.

6

Image 8
Contents 721 Warranty Statement Applicability Table of ContentsSpecifications Features and Operating Controls Features and Operating Controls Description CommentsInternal Components Precautions and General Information Agency Listing InformationElectrical Damage Burn HazardLeveling the Unit InstallationPLUMBER’S Installation Instructions Shock Hazard InstallationELECTRICIAN’S Installation Instructions Initial SET-UP WATERLINE-CONNECTED Dispensers OperationOperating Modes Operation Initial SET-UP Portable DispensersInstall Product Hoppers Fill Product HoppersProcedure Daily Cleaning Dispenser Cleaning InstructionsCleaning Instructions Procedure Weekly Cleaning & SanitizingProcedure Weekly Cleaning Hoppers Troubleshooting Suggestions WaterTroubleshooting Suggestions Spout with Power OFFHOT Water Adjustment Servicing InstructionsCold Water Adjustment Product Delivery Grams Ounce of Water Servicing InstructionsReplace Product Delivery Auger Procedure Delime the Water Tank Chemical Burn HazardExploded Views Exploded Views Exploded Views Exploded Views Exploded Views Service Parts List AccessoriesWiring Diagram 9456 Telephone Fax

9456, 9454 specifications

Bloomfield 9454 and 9456 are two robust technologies that stand out in the realm of modern industrial design and automation, catering to diverse sectors such as manufacturing, logistics, and data management. These systems are distinguished by their innovative features, cutting-edge technologies, and impressive characteristics, making them essential components for industries aiming to enhance efficiency and streamline operations.

The Bloomfield 9454 is primarily characterized by its modular architecture, allowing businesses to adapt the system according to their specific requirements. This flexibility enables quick upgrades and scaling, ensuring that users can easily incorporate new functionalities without extensive downtime. Additionally, the 9454 is equipped with high-performance processors that deliver swift data processing and real-time analytics, facilitating informed decision-making processes.

On the other hand, Bloomfield 9456 takes a more integrated approach. It combines both hardware and software solutions, creating a unified platform that enhances operational coherence. The 9456 features advanced machine learning algorithms that optimize production workflows by predicting maintenance needs and analyzing performance metrics. This proactive approach not only minimizes unexpected disruptions but also enhances overall productivity.

Both systems boast user-friendly interfaces that facilitate ease of operation, ensuring minimal training time for personnel. The intuitive dashboards provide clear visualizations of critical data, enabling operators to monitor performance metrics at a glance. In terms of connectivity, Bloomfield 9454 and 9456 come equipped with robust IoT capabilities, promoting seamless integration with existing machinery and enterprise systems. This interconnectedness is essential for fostering a cohesive operational ecosystem, allowing for efficient communication and data sharing across the enterprise.

Moreover, both Bloomfield technologies prioritize security, incorporating advanced cybersecurity measures to protect sensitive data from potential threats. As industries increasingly pivot towards automated solutions, the demand for secure and reliable systems has never been higher.

Ultimately, Bloomfield 9454 and 9456 represent the pinnacle of technological innovation in industrial automation. Their unique features, combined with a focus on adaptability, performance, and security, make them indispensable tools for companies aiming to remain competitive in an ever-evolving marketplace. Organizations looking to enhance their operational efficiency and embrace the capabilities of advanced technologies would do well to consider the transformative potential of these Bloomfield systems.