Bloomfield 2074L, 2072FRL, 2012, 2016EX, 2074FRL ELECTRICIAN’S Installation Instructions

Page 7

INSTALLATION INSTRUCTIONS (continued)

For ‘Filter-Ready” units, refer to filter installation and hook-up instructions packed with the brewer.

5.NSF requires that the brewer be able to be moved for cleaning underneath. A flex line or loops of copper tubing will satisfy this requirement.

COPPER LOOPS OR FLEX LINES

(PROVIDED BY PLUMBER)

SHUT-OFF VALVE

SOLENOID

STRAINER

(PROVIDED BY

WASHER

PLUMBER)

 

FLOW

WATER

SUPPLY

6.In some areas, local codes require a backflow preventer (check valve) to be installed on the inlet water line. If a back flow preventer is used, you must install a water hammer arrester in the incoming line, between the backflow preventer and the brewer inlet, as far away from the brewer as space will allow. This will relieve the excessive back pressures that can cause faucet leaks and solenoid malfunctions.

ELECTRICIAN’S INSTALLATION INSTRUCTIONS

REFER TO ELECTRICAL SPECIFICATIONS - Page 1

Check the nameplate to determine correct electrical service required for the Brewer to be installed.

NOTE: Models 2012 & 2072 require a 115 - 125 V 15A circuit (50/60 Hz, 2 wire plus earth ground, with

NEMA 5-15R or 5-20R Receptacle)

Models 2016 & 2074 require a 120/240V 20A circuit (50/60 Hz, 2 hot legs / 1 neutral leg, plus earth ground). Circuit must be capable of 3500 Watts.

AGENCY LISTING INFORMATION

This brewer is

and

listed under UL file E9253.

This brewer meets

 

Standard 4 only when installed,

operated and maintained in accordance with the enclosed instructions.

NOTE: This equipment must be installed to comply with applicable federal, state and local plumbing codes and ordinances.

WARNING ELECTRIC SHOCK HAZARD:

Brewer must be properly grounded to prevent possible shock hazard. DO NOT assume a plumbing line will provide such a ground. Electrical shock will cause death or serious injury.

IMPORTANT: Do not attempt to override the automatic tank fill feature which requires that the tank must be full of water to start operations. Any attempt to override this feature will void the warranty.

IMPORTANT:

Before connecting to electricity, make sure the E-Max™ has been properly connected to the water supply.

IMPORTANT:

Supply power must match nameplate for voltage and phase. Connecting to the wrong voltage will damage the brewer or result in decreased performance. Such damage is not covered by warranty.

E9253

E9253

STD 4

5

Image 7
Contents 651 Warranty Statement Specifications Table of ContentsFeatures and Operating Controls Electrical Damage Precautions and General InformationUnpacking & Initial Inspection Installation InstructionsPLUMBER’S Installation Instructions Equipment HazardELECTRICIAN’S Installation Instructions Installation InstructionsOperating Instructions OperationBurn Hazard USER’S GuideProgramming Features and Options Clock Operation Electric Shock Hazard Cleaning InstructionsFunction Servicing Instructions PlumbingServicing Instructions Plumbing Risk of Injury Servicing Instructions ElectricalServicing Instructions Electrical Burn Hazard Servicing Instructions DE-LIMING Water Heater TankCause Suggestions for Remedial Action Troubleshooting SuggestionsWarmer IN-LINE Brewer Exploded View & Parts ListModels 2012 Exploded View & Parts List Models 2072 Warmer STEP-UP BrewerExploded View & Parts List IN-LINE Brewer 120 Volt Wiring DiagramsWiring Diagrams Volt IN-LINE BrewerPage Telephone Fax