Bunn IC2B warranty Operating Controls, Coffee Brewing, Lighted On/Off Switch, Start Switch

Page 5

OPERATING CONTROLS

A.Lighted On/Off Switch

ON - Placing the switch in the lighted upper position allows the start switch to activate a brew cycle.

OFF - Placing the switch in the lower position stops the brew cycle. Stopping a brew cycle after it has been started will not stop the flow of water into the funnel until the tank syphons down to its proper level.

NOTE - The switch should always be placed in the “OFF” position after a brew cycle and whenever the brewer is unattended.

B.Start Switch

Starts a brew cycle when the lighted On/Off switch is in the “ON” position.

COFFEE BREWING

1.Begin each brew cycle with a clean empty brew funnel and dispenser. (Be sure the dispenser lid doesn’t interfere with the flow of dilution water.)

2.Insert a BUNN® tea filter into the funnel.

3.Pour the recommended amount of fresh coffee into the filter.

4.Level the bed of coffee grounds by gently shaking.

5.Slide the funnel into the funnel rails until it stops.

6.Place the On/Off switch in the lighted “ON” position.

7.Place the batch selector switch in the desired position.

8.Momentarily press the start switch.

CAUTION - The funnel contains hot liquids. Remove funnel slowly.

9.Carefully remove the funnel and discard the used filter when coffee no longer drips from the funnel.

10.Place the lighted On/Off switch in the “OFF” position to prevent a false start.

11.Room temperature fresh coffee is available at the faucet.

Page 5

10822 061594

 

Image 5
Contents Introduction WarrantyElectrical Requirements User NoticesInitial SET-UP Plumbing RequirementsElectrical Hook-Up Plumbing Hook-UpInitial SET-UP CleaningStart Switch Lighted On/Off SwitchOperating Controls Coffee BrewingReplacement Parts Schematic Wiring Diagram IC2
Related manuals
Manual 8 pages 3.76 Kb