Bunn IC2B warranty Plumbing Requirements, Initial SET-UP, Electrical Hook-Up, Plumbing Hook-Up

Page 3

Electrical Hook-Up

CAUTION – Improper electrical installation will damage electronic components.

1.An electrician must provide electrical service as specified.

2.Remove the top lid and rotate the control thermostat knob fully counterclockwise to the “OFF” position and reinstall the top lid.

3.Remove the rear trunk panel, feed the cord through the strain relief at the rear of the brewer and connect it to the terminal block.

4.Using a voltmeter, check the voltage and color coding of each conductor at the power source.

5.Connect the brewer to the power source and verify the voltage at the terminal block and reinstall the rear trunk panel.

6.If plumbing is to be hooked-up later be sure the brewer is disconnected from the power source. If plumbing has been hooked-up, the brewer is ready for Initial Set-Up.

WARNING – The brewer must be electrically grounded using the green screw near the terminal block. Do not assume a plumbing line will provide an adequate ground.

PLUMBING REQUIREMENTS

This brewer must be connected to a cold water system with operating pressure between 30 and 90 psi (207 and 620 kPa) from a 12" or larger supply line. A shut-off valve should be installed in the line before the brewer. Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa). The water inlet fitting is 14" flare.

NOTE - Bunn-O-Matic recommends 14" copper tubing for installations of less than 25 feet and 38" for more than 25 feet from the 12" water supply line. A tight coil of copper tubing in the water line will facilitate moving the brewer to clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type of device may restrict water flow.

This equipment must be installed to comply with the Basic Plumbing Code of the Building Officials and Code Administrators International, Inc. (BOCA)

and the Food Service Sanitation Manual of the Food and Drug Administration (FDA).

Plumbing Hook-Up

1.Attach the female fitting from the short piece of tubing on the strainer assembly (supplied) to the water inlet fitting on the rear of the brewer.

2.Flush the water line and securely attach it to the flare fitting on the strainer assembly.

3.Turn on the water supply.

INITIAL SET-UP

CAUTION - The brewer must be disconnected from the power source throughout the initial set-up, except when specified in the instructions.

1.Remove the top lid from the brewer.

2.Rotate the control thermostat knob fully counterclockwise to the “OFF” position. Set the timer knob at eight minutes and replace the top lid.

3.Insert an empty funnel into the funnel rails.

4.Place an empty two-gallon dispenser on the brewer base. The opening in the top of the dispenser must be directly beneath the funnel dripout and the dilution nozzle.

Page 3

10822 061594

 

Image 3
Contents Introduction WarrantyElectrical Requirements User NoticesPlumbing Hook-Up Plumbing RequirementsInitial SET-UP Electrical Hook-UpInitial SET-UP CleaningCoffee Brewing Lighted On/Off SwitchStart Switch Operating ControlsReplacement Parts Schematic Wiring Diagram IC2
Related manuals
Manual 8 pages 3.76 Kb