Bunn CDS-3, CDS-2 Lamp Cord Connector, Disconnect the lamp cord from the lamp cord connector

Page 24

SERVICE (cont.)

LAMP CORD CONNECTOR

P1923

FIG. 19 LAMP CORD CONNECTOR

Location:

The lamp cord connector is located on top of the dispenser.

Test Procedures:

1.Disconnect the dispenser from the power source.

2.Disconnect the lamp cord from the lamp cord connector.

3.Disconnect the plug on the dispenser main harness from the connector from the lamp cord connector.

4.Check the voltage across the two pin holes on the main harness plug with a voltmeter and Day/Night switch in the "DAY" position and the "ON/OFF" switch in the "ON" position. Verify that the dispenser hopper is full and in place, the dispenser probe contact is making contact with the CDS liquid level probe, and the dispenser door is closed. Connect the dispenser to the power source. The indication must be approximately 12.6 volts ac.

5.Disconnect the dispenser from the power source.

If voltage is present as described, proceed to #6.

If voltage is not present as described, refer to the wir- ing diagram and check the dispenser main wiring har- ness.

6.Check for continuity between pin 1 (red) of the lamp cord connector and the center terminal of the lamp cord connector. Check for continuity between pin 2 (black) of the lamp cord connector plug and the lamp cord connector body. Check for continuity between pins 1 & 2 of the lamp cord connector plug. Continuity must not be present between pins 1 & 2.

If continuity is present as described, the lamp cord connector is operating properly.

If continuity is not present as described, replace the lamp cord connector.

Removal and Replacement:

1.Disconnect the lamp cord assembly from the lamp cord connector.

2.Remove the six #8-32 screws securing the rear cover to the dispenser.

3.Disconnect the lamp cord connector wires from the dispenser main wiring harness.

4.Remove nut and washer securing the lamp cord connector to the dispenser. Remove and set aside the insulating washers and discard nut, washer and lamp cord connector.

5.Remove new nut and washer from new lamp cord connector.

6.Install the insulating washers to the hole in the top of the dispenser. Push new lamp cord connector through the holes in the insulating washers and secure with the new nut and washer.

7.Reconnect the wires on the cord connector to the dispenser main wiring harness.

8.Connect the lamp cord to the lamp cord connector.

9.Install the rear cover to the dispenser and secure with six #8-32 screws.

To Main Harness

P1928

FIG. 20 LAMP CORD CONNECTOR

24

29793 061599

 

Image 24
Contents Post Office BOX SPRINGFIELD, Illinois Phone 217 529-6601 FAX 217BUNN-O-MATIC Commercial Product Warranty IntroductionInitial SET-UP User Notices Operating Instructions Adjustments Cleaning Recommended Daily Cleaning and Maintenance TipsRemoving and cleaning the whipper chamber once a day Thorough cleaning of the hopper once a weekFault List Normal operation Powder Auto-Fill ready toDispense Door not closedTroubleshooting Problem Probable CauseTroubleshooting ProblemRemedy CDS product tastes watery or sugaryProblem Probable Cause Remedy Procedures. See Improper adjustment of productInstall a regulator if necessary to Product overflows CDS hopper Control Board and ProbeService Component AccessContents Auger Drive Components Hopper LidRetainer Clip Spacer Dust Seal Hopper BaseDiagrams and check wiring harness Auger Drive MotorFrother and MIXING/WHIPPER Chamber Mixing ChamberWhipper Motor Volts ac for 120 volt models Volts ac for 230 volt CE modelsInstall dispense tip into the bottom of the whipper chamber Whipper MotorControl Board and Level Probe If voltage is present as described, proceed to #5If voltage is present as described, proceed to #9 Test Procedure Low Product Detect Instal the new control board using the four #6-32 keps nuts Remove the control boardTEST/SERVICE Switch Disconnect the wires from the switch terminalsLocation Main Power ON/OFF Switch Main Power ON/OFF SwitchLamp Cord Assembly Refer to when reconnecting the wiresLamp Cord Connector Disconnect the lamp cord from the lamp cord connectorRemove new nut and washer from new lamp cord connector Lamp HOLDER/SOCKET Assembly Close the dispenser doorTransformer TransformerPotentiometer PotentiometerHopper Level Indicator Hopper Level IndicatorHopper Switch Hopper SwitchDoor Switch Door SwitchAdjustments Pressure Regulator and Needle ValveDispense Solenoid Valve Dispense Solenoid Valve LocationWiring Diagrams Schematic Wiring Diagram PAFSchematic Wiring Diagram Pafa
Related manuals
Manual 60 pages 54.74 Kb Manual 34 pages 40.35 Kb

CDS-2, CDS-3 specifications

The Bunn CDS-3 is a commercial coffee brewer renowned for its reliability, efficiency, and high-quality performance. Designed for busy environments such as cafés, restaurants, and convenience stores, it offers the perfect balance of capacity and functionality, making it ideal for high-demand situations.

One of the standout features of the Bunn CDS-3 is its ability to brew up to 3.8 gallons of coffee per hour. This impressive capacity meets the needs of busy establishments where a constant supply of fresh coffee is crucial. The brewer’s stainless steel construction not only ensures durability but also maintains temperature, thus preserving the coffee’s rich flavor and aroma.

The CDS-3 incorporates Bunn's patented brewing technology, including the "Pour-Over" method. This feature allows for easy operation and contributes to the even extraction of coffee grounds. The machine is equipped with a pre-infusion mode that saturates coffee grounds before brewing, enhancing extraction for a fuller, more complex flavor profile.

Temperature control is another vital characteristic of the Bunn CDS-3. It maintains the water temperature between 195°F to 205°F, the ideal range for optimal coffee brewing. The brewer’s internals are designed for rapid heating, ensuring that the water reaches the desired temperature quickly and consistently, which is essential for high-quality coffee production.

In terms of usability, the Bunn CDS-3 offers an intuitive interface, allowing staff to operate it with minimal training. The front-access design not only simplifies maintenance, but also makes it easy to refill water and perform routine cleaning. Furthermore, the large capacity coffee pots ensure that the brewed coffee can be stored efficiently, minimizing waste.

Equipped with a unique spray head system, the Bunn CDS-3 ensures uniform saturation of the coffee grounds. This feature supports optimal extraction, allowing users to produce a rich and flavorful brew that keeps customers coming back for more.

In summary, the Bunn CDS-3 is a well-engineered, commercial-grade coffee brewer that excels in high-demand environments. Its robust construction, advanced brewing technology, consistent temperature control, and user-friendly design make it a favorite among coffee enthusiasts and professionals alike, affirming its reputation as a reliable and effective solution for coffee brewing needs. Whether for a bustling café or a catering service, the Bunn CDS-3 delivers a consistently great cup of coffee every time.