Bunn F-15, F-35, F-20 service manual Flow Valve

Page 9

 

 

 

I I

l

 

which

hold

solenoid

 

 

 

f Iare

,--. \\ II It'

"-

 

 

remove front panel.

chassissolenoidtertofrom-

 

 

.

 

 

 

 

ShutToRemove(B&C)Disconnectoffgainwater2screwsleadsaccesssupplySOLENOID(A)(D)

VALVE

 

 

 

3.

tofrombrewer.

 

 

solenoid

valve.

SOLENOIDvalve

 

 

II

~,~~\P~3

 

.

 

~ I

 

 

2.

 

 

 

1bracket.

 

FLOW VALVE

1. To gain access remove top cover via screw(s) on top.

2. Loosen flare nuts (B and C) and free short piece of water line from flow valve (D).

3. Remove flow valve (D).

NOTE: When installing new flow valve into solenoid, be sure direction of arrow is away from solenoid.

REPLACING ON-OFF SURFACE HEATER ELEMENTS

1.Remove lower warmer cover plate and heat spreader by

unscrewing center sheet metal screw. DO NOT REMOVE SMALL SCREWS HOLDING EDGE OF SAUCER.

2.To remove the lower warmer, lift element, bringing down- curved ends out through curved slot in saucer assembly.

3.Disconnect blue and white spade-clipped wires from element terminals. These are interchangeable when replacing element.

4.To install new element, bring spade-clipped wires up through curved slot, reconnect them, and place element in original position. Be sure heat spreader is replaced between element and cover plate.

LOWER WARMER ASSEMBLY 5. Warmer elements on the top of the brewer are not as shown at left. Remove 3 screws holding saucer and remove element.

FACTORY AUTHORIZED SERVICE

9

Image 9
Contents Coffee Brewers Model F15 Electrical Requirements32\..-t Is depressed, but and water shut off valve IningStartcontact,brew cycle Solenoid Valve Tank heaterAndCheckmakesto see if Be at least 2 minutesAny particles that may Receiving decanterConnected to Cold Water line Terminalsarebeing. used.Should Control Thermostat TimerTank Heater RelayFlow Valve ValveLliJ Schematic Wiring Diagram F15Parts ~~~--c