Bunn FPG-2 DBC manual Timer Adjustment Control Board, Approximate Amount in Ounces

Page 5

TIMER ADJUSTMENT (CONTROL BOARD)

Three different batch settings are selectable for each hopper. Each batch is independently adjustable by setting the length of time a slide gate opens to allow beans to drop into the grinding chamber. A second time setting for each batch determines how long the grind motor continues to run after the slide gate closes. This time is set long enough to insure that all the beans dropped into the grind chamber are ground and dispensed.

1.Determine the grind setting. (The factory setting is drip, to determine other settings, refer to the previous section.)

2.Use the table below to find approximate timer setting for the amount of coffee desired.

3.To enter the setup mode and make an adjustment, press and hold the hidden programming pad under the ¨. One of the batch indicators will begin to flash off and on. At this point, release the ¨ button.

4.Push the hopper/batch selector button for the batch to be adjusted. Note that the digital display shows the current slide gate time setting (in seconds).

5.To increase the time, press . To decrease, press .

6.To change the chamber clean-out time, press the same batch button again and note that the indicator light begins to blink more rapidly and the display shows the current clean-out time.

7.To increase the time, press To decrease it, press .

8.After the cleanout time has been entered, press another batch pad and repeat steps 4 to 7. Otherwise, to exit the programming mode, press and release the ¨ pad and the grinder returns to the normal operating mode, using the new settings.

NOTE: While in the setup mode, if no buttons are pushed for 60 seconds, the grinder will return to normal operations, retaining any settings made while in the setup mode.

Approximate Amount (in Ounces)

Timer Settings (in Seconds)

1-1/2

2.5

2

4.5

2-1/2

7.5

3

10.5

These times are for medium roast, regular grind coffee.

Roast of coffee and grinds size will vary timer setting.

5

36705

031505

 

 

Image 5
Contents FPG-2 DBC Introduction Electrical Requirements User NoticesAdjustments CleaningBurr Adjustment Initial SET-UPApproximate Amount in Ounces Timer Adjustment Control BoardVolts AC Wire Single Phase Schematic Wiring Diagram FPG-2 DBC
Related manuals
Manual 2 pages 51.11 Kb