Bunn 41167.0001B service manual Programming Switches, Hidden Switch, Small Brew B, Large Brew a

Page 10

PROGRAMMING SWITCHES

HIDDEN SWITCH

Press until display reads

"BREW LOCKOUT"

HIDDEN SWITCH Step forward through

screens

HOT WATER

"YES" or (+)

OPEN/CLOSE

"NO" or (-)

SMALL BREW (B)

Step backwards through

screens

LARGE BREW (A)

"DONE"

Page 10

41167.1 051508

 

Image 10
Contents Installation & Operating Guide BUNN-O-MATIC Commercial Product Warranty Introduction User NoticesCE Requirements Electrical RequirementsVolt Model Volt CE Model Volt UK Model Electrical Hook-Up Plumbing Requirements Plumbing Hook-UpOPEN/CLOSE Initial SET-UPOperating Controls HOT WaterHOT Water Dispensing OperationCoffee Brewing POD Inserted BoosterSprayhead CleaningBIN /DRIPTRAY Tank Draining Factory BlowoutSmall Brew B Programming SwitchesHidden Switch Large Brew aProgram Overview Adjustments & Optional Settings Drip Done YES Brew Count ## Calibrate Flow ? Reset NextYES Service Tools ? Done Done YES