Bunn 41167.0001B Operation, Coffee Brewing, HOT Water Dispensing, POD Inserted Booster

Page 7

OPERATION

COFFEE BREWING

1.Place cup under brew chamber FIG 8-1. (Slide booster out for small cups) FIG 8-3.

2.Press the OPEN/CLOSE switch to open pod door FIG 8-2.

3.Press fresh pod firmly down into pod holder FIG 8-3.

4.Press the OPEN/CLOSE switch to close pod door FIG 8-2.

5.Press the desired brew switch.

6.Once the brew cycle is finished, display will read "BREWING COMPLETE", remove cup after display returns to main screen.

FIG 8-4

HOT WATER DISPENSING

1. Place cup under brew chamber FIG 8-1. (Slide booster out for small cups) FIG 8-3.

2. Press and hold the HOT WATER switch to fill. FIG 8-4 NOTE: Maximum of 10 oz.

FIG 8-1

POD INSERTED

BOOSTER

FIG 8-2

 

Page 7

FIG 8-3

 

 

 

41167.1 041410

 

 

 

Image 7
Contents Installation & Operating Guide BUNN-O-MATIC Commercial Product Warranty User Notices IntroductionCE Requirements Electrical RequirementsVolt Model Volt CE Model Volt UK Model Electrical Hook-Up Plumbing Hook-Up Plumbing RequirementsHOT Water Initial SET-UPOperating Controls OPEN/CLOSEPOD Inserted Booster OperationCoffee Brewing HOT Water DispensingSprayhead CleaningBIN /DRIPTRAY Factory Blowout Tank DrainingLarge Brew a Programming SwitchesHidden Switch Small Brew BProgram Overview Adjustments & Optional Settings Done Done YES Done YES Brew Count ## Calibrate Flow ? Reset NextYES Service Tools ? Drip