Bunn 28222.70006 manual Operating Controls, Coffee Brewing, Cleaning

Page 7

OPERATING CONTROLS (cont.)

(d)BREW SELECTOR SWITCH

Placing the switch in the 1/2 gallon, 1 gallon, 1-1/2 or 1-3/4 gallon position selects the amount of coffee to be brewed in subsequent brew cycles. Repositioning this switch after a brew cycle has been initiated does not change the brew batch in progress.

(e)GRINDER SELECTOR SWITCH

Pressing the right or left side of the switch selects the corresponding brew station to the grinder interface. NOTE – The On/Off switch must be in the lighted upper position to initiate and complete a brew cycle.

COFFEE BREWING

1.Select the desired batch size.

2.Insert a BUNN filter into the funnel.

3.Pour the proper amount of fresh coffee into the filter and level the bed of grounds by gently shaking.

4.Slide the funnel into the funnel rails.

5.Place an empty server under the funnel.

6 Place the On/Off switch in the lighted upper position. Momentarily press and release the start switch. 7. When brewing is completed, simply discard the grounds and filter.

CLEANING

1.The use of a damp cloth rinsed in any mild, nonabrasive, liquid detergent is recommended for cleaning all surfaces on Bunn-O-Matic equipment.

2.Remove and clean the sprayhead. Use the pointed end of sprayhead cleaning tool (#38227.0000) to remove any mineral deposits from the sprayhead holes.

3.Insert the long end of sprayhead cleaning tool into the sprayhead fitting, and rotate several times to remove any mineral deposits from the fitting.

4.Insert the short end of sprayhead cleaning tool into the bypass fitting, and rotate several times to remove any mineral deposits from the fitting.

NOTE: In hard water areas, this may need to be done daily. It will help prevent liming problems in the brewer and takes less than a minute.

Page 7

28222 010708

 

Image 7
Contents Phone 905 841-2866 FAX 905 Dual SHIntroduction BUNN-O-MATIC Commercial Product WarrantyReturn Policy 03408.7002 User Notices00831.0002 00656.7000 37881.7000200, 230 and 240 volt ac models Electrical RequirementsElectrical Hook-Up CE RequirementsPlumbing Requirements Adjusting Brew VolumesInitial SET-UP Operating Controls Adjusting Brew VolumesOperating Controls CleaningCoffee Brewing Choix votre de côté le sur Appuyez .droit d’infusion ’infusion cycle un terminer et lancer pourCours en cycle le Cont, Volumes Brew Adjusting Tuyauterie LA DE Raccordement TuyauterieÉlectrique Branchement CE Européenne Norme0002.00831 7000.00658 ’UTILISATEUR À Avis7000.00656 7000.36302 7002.03409 7000.39803’œuvre Commercial Produit DE Garantie MATIC-O-BUNNRobuste travail de plan un sur placé être doit ’équipement de d’achat’UTILISATION ET D’INSTALLATION Manuel