Bunn JDF-2 manual Initial SET-UP, Electrical Requirements, Plumbing Requirements, CE Requirements

Page 4

INITIAL SET-UP

CAUTION: The dispenser is very heavy! Use care when lifting or moving it. Use at least two people to lift or move the dispenser. Place dispenser on a sturdy counter or shelf able to support at least 150 lbs. (68 kg). The JDF-2 is designed for indoor use only.

Set the dispenser on the counter where it will be used. The JDF-2 requires a minimum of 4 inches (102 mm) of air clearance at the rear and 8 inches (203 mm) of air clearance above the dispenser. Minimal clearance is required between the dispenser sides and the wall or another appliance. For optimum performance, do not let warm air from surrounding machines blow on the JDF-2. Leave some space so the dispenser can be moved for cleaning.

ELECTRICAL REQUIREMENTS

CAUTION: The dispenser must be disconnected from the power source until specified in Electrical Hook-Up.

The 120V rated dispensers have an attached cord set and require a 2-wire, grounded, individual branch circuit rated

120 volts ac, 15 amp, single phase, 60Hz. The mating connector must be a NEMA 5-15R. (Refer to the data plate for exact electrical requirements.)

The 230V rated dispensers have an attached cord that requires an attachment plug cap rated at least 10a, 230V. The attachment plug cap must meet with applicable national/local electrical codes.

ELECTRICAL HOOK-UP

CAUTION: Improper electrical installation will damage electronic components.

1.An electrician must provide electrical service as specified.

2.Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.

3.Connect the dispenser to the power source.

4.If plumbing is to be hooked up later, be sure the dispenser is disconnected from the power source. If plumbing has been hooked up, the dispenser is ready for Initial Fill.

PLUMBING REQUIREMENTS

This dispenser must be connected to a COLD WATER system with operating pressure between 20 and 100 psi (138 and 690 kPa). This water source must be capable of producing a minimum flow rate of 3 fluid ounces (88.7 milliliters) per second. A shut off valve should be installed in the line before the dispenser. Install a regulator in the line when pressure is greater than 100 psi (690 kPa) to reduce it to 50 psi (345 kPa). Also if the install location experiences pressure fluctuations greater than 20 psi (138kPa). The main water inlet is a 3/8” (9.52 mm) MFL connection.

Additionally, the dispenser’s rinse connection may be connected to a HOT WATER system.

Caution:

MAXIMUM RINSE WATER TEMPERATURE: 170 degrees F (76.6 degrees C)

Use BUNN-O-MATIC tubing, part number 34325.10_ _ (see Illustrated Parts Catalog for complete part number) for hot water connection.

The rinse water operating pressure must be between 20 and 100 psi (138 and 690 kPa). A shut off valve should be installed in the line before the dispenser. Install a regulator in the line when pressure is greater than 100 psi (690 kPa) to reduce it to 50 psi (345 kPa). The rinse water inlet is a 1/4” (6.35 mm) MFL connection.

NOTE- At least 18 inches (457 mm) of an FDA approved flexible beverage tubing, such as reinforced braided

CE REQUIREMENTS

This appliance must be installed in locations where it can be overseen by trained personnel.

For proper operation, this appliance must be installed where the temperature is between 0°C to 35°C.

Appliance shall not be tilted more than 10° for safe operation.

An electrician must provide electrical service as specified in conformance with all local and national codes

This appliance must not be cleaned by water jet.

This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capa- bilities, or lack of experience and knowledge, unless they have been given instructions concerning use of this appli- ance by a person responsible for its safety.

If the power cord is ever damaged, it must be replaced by the manufacturer or authorized service personel with a special cord available from the manufacturer or its authorized service personel in order to avoid a hazard.

4

38310 030308

 

Image 4
Contents JDF-2 Phone 217 529-6601 FAX 217BUNN-O-MATIC Commercial Product Warranty Contents User NoticesInitial SET-UP Electrical RequirementsPlumbing Requirements CE RequirementsPlumbing Requirements Initial FillLoading PrimingPlumbing Hookup Frozen ConcentratesRefrigeration Switch Refrigeration SwitchSanitize Switch Operating ControlsOperating Controls Press and Hold Models Refer to Fig Dispenser USEPortion Control Models Refer to Fig Daily Parts Washing Cleaning & Preventive MaintenanceWeekly Sanitizing Cleaning Cleaning Monthly Clean Condenser Air Filter Annually Replace Pump TubingAdjustment & Optional Settings Temperature Compensated Refractometer MethodProduct Brix % Mix RatioPer 3-second test Adjustment & Optional Settings Pump Speed Programming Cup Size Programming Portion Control Dispensers OnlyAdjustment & Optional Settings Dispenser Lockout Service LockoutAdjustment & Optional Settings Password ProtectionDispense Fault List Beeper FaultCooling Fault List DBC display FaultDip Switch Function List Refill indicator when concentrate out is detectedControls Off Audio feedback during dispensesFunction List Troubleshooting Problem Probable CauseAccess bath fill valve and top off bath tank All water LEDs flashTroubleshooting ProblemCooling system failure or DBC fault RemedyBottle adapter switch mem- brane Dispense touchpadRefill LED not extinguishing All stations dispense concentrate Main water supply OnlyConcentrate only Problem Probable Cause RemedyWater only Initial fill/setup Cant access programming Programming password featurePassword Nect fittingsFault codes Is powered from the step-downOnce water is set, adjust motor Step-down transformerDifficulty brixing and/or weak bev Pump tubing Erage StationUse of portable water pump Difficulty brixing bag-in-boxCoolant Schematic Diagram Schematic Wiring Diagram Schematic Wiring Diagram Schematic Wiring Diagram JDF-2 Control Panel Circuit Schematic Wiring Diagram JDF-2 Remaining Circuits

JDF-2 specifications

The Bunn JDF-2 is a cutting-edge coffee brewing system designed for high-performance environments such as coffee shops, restaurants, and offices. This versatile machine combines advanced brewing technologies with user-friendly features, making it a popular choice among coffee aficionados and professionals alike.

One of the standout features of the Bunn JDF-2 is its ability to brew coffee quickly and efficiently. The machine boasts an innovative brewing system that utilizes an advanced heat exchange technology, ensuring that water is heated to the optimal brewing temperature in no time. This results in a rapid brew time, allowing operators to serve freshly brewed coffee continuously, even during peak hours.

The Bunn JDF-2 is equipped with a digital control interface that allows users to customize their brewing settings with ease. This interface features adjustable brew times, water temperatures, and batch sizes, allowing baristas to fine-tune each brew to achieve the perfect flavor profile. Additionally, the machine can store multiple recipe presets, enabling quick access to different brewing styles.

Durability and reliability are also key characteristics of the Bunn JDF-2. Constructed from high-quality materials, it is designed to withstand the rigors of everyday use. This commercial-grade machine is built to last, ensuring that businesses can rely on it for consistent performance over time. The JDF-2 also incorporates a variety of safety features, including automatic shut-off mechanisms and easy-access components for maintenance, making it a safe choice for busy environments.

The Bunn JDF-2 employs a dual brewing system, which can brew both regular and decaffeinated coffee simultaneously. This feature is particularly beneficial for establishments that cater to diverse customer preferences. The machine's capabilities also extend to brewing specialty beverages, further enhancing its versatility.

In terms of design, the Bunn JDF-2 presents a sleek and modern aesthetic that complements any coffee shop or commercial kitchen. Its compact size allows for easy integration into existing workflows, maximizing space efficiency without compromising performance.

Overall, the Bunn JDF-2 stands out as a premier choice for those seeking a powerful, efficient, and user-friendly coffee brewing system. With its advanced technologies, customizable settings, and robust construction, it meets the demands of both high-volume coffee operations and discerning coffee lovers.